Summary 2/3/20

From Cuawiki
Revision as of 09:30, 3 February 2020 by Hyde (talk | contribs) (Created page with "Notes by Charles Hyde •Summarize full to-do list in hall, and estimated time to completion •Estimate time for configuration changes during beam running •Document interfe...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Notes by Charles Hyde •Summarize full to-do list in hall, and estimated time to completion •Estimate time for configuration changes during beam running •Document interferences between NPS, BeamLine, HMS ••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022) • How is the Calorimeter, Cabling, etc assembled