DAQ in EEL 108

From Cuawiki
Revision as of 08:53, 24 January 2023 by Rom (talk | contribs)
Jump to navigation Jump to search

How to run the DAQ in EEL building room 108.

Three VXS crates each with 15 FADCs. So, that is 720 channels of FADC.

user: hccoda Password is posted near the screen computer: cdaql3

Start/stop runs

Usually the DAQ is already running one of the workspaces on cdaql3 (giant screen). Then it's like any other CODA system. Stop/start runs with the Run Control GUI (rcgui).

How to CODA start from scratch.

On hccoda@cdaql3, type "startCoda" (note the capital C). The xterms with components pops up. Those are the 3 crates nps-vme1, nps-vme2, nps-vme3, as well as the event builder PEB1. The Run Control GUI (rcgui) pops up. We normally want the configuration "NPS_3crate" for the aforementioned crates. We also have single-VME configs ("vme1", "vme2", "vme3") but they only work if the trigger is plugged into the master TI. More on trigger below.

- FADC parameters are defined in the usual config file

ssh -X nps-vme1 -l hccoda c cd cfg and see nps-vmeN.cfg where N = 1, 2, 3 Please don't modify these unless you know what you are doing.

Trigger

Curently (Jan 24, 2023) the trigger is a front-panel trigger going into the 7th input of the TI-master. This input is labelled "TS#1". Later we'll have a fancy VTP trigger and I'll update this. But currently the trigger consists of the "and" between a scintillator on top and bottom of the calorimeter. And each scintillator is the "or" of the two PMTs that are connected to the two ends of the scintillator.