General Meeting Summary 6/8/17
Jump to navigation
Jump to search
MAGNET UPDATE
- Expect corrector coil to arrive later this month
- Main coil work is ongoing, anticipate arrival at Jlab in August
- Yoke work ongoing, some confusion about extra steel that has been resolved, expect the yoke to arrive in August
- Action Item: have space for big items available in late July/early August
CRYSTAL ACTIVITIES
- First batch of 2017 SICCAS crystals expected to arrive late June
- Clean room is ready - see this picture for status on 6/6/17
- shelves should be able to hold 40-50 crystals each - should be sufficient for all NPS crystals
- shelves are (or will be) covered with a protective foam material
- CRYTUR 5th production cycle crystal
- transmittance and radiation hardness look good, transmittance on the low side
- next, discuss pricing options with company
- SICCAS crystal characterization at IPN-Orsay
- 10 crystals have arrived after some delay in customs
- Transmittance studies completed, light yield studies with Co-60 source ongoing
FRAME
- Draft design should be ready by end of the year - first finalize curing system
- Still need to finalize one aspect of overall design - remove an interference on beam side, make design symmetric. Time frame for this is July.
PMT HIGH VOLTAGE DIVIDERS
- Still need final drawings to start construction of bases - Hamlet will check with Fernando
- one aspect to quantify is cabling off the divider
PAC45 PROPOSALS
- WACS proposal was submitted successfully, a version was circulated to the NPS collaboration
- No comments yet from reviews - expect the first in late June. PAC45 meets in the week of 10 July.
- There will be a dedicated presentation on the photon source at the PAC45 meeting
NEXT MEETING: THUR 6 JULY AT 9:00 AM (EDT) - NOTE THAT THIS MEETING MAY RUN A LITTLE LONG SINCE WILL INCLUDE PAC45 DRY RUNS