CPS Summary 1/23/18
Jump to navigation
Jump to search
ROTATING TARGET
- Discussion about rotation scheme and mechanical movement and material
PION-KAON PHYSICS
- Discussion about new physics with a K-long beam
K-LONG BEAM EXPERIMENT
- Experiment will access KLp --> Ksp and KLp --> pi+Lambda at a KL rate of 10^4 KL/s - this is 2500 times SLAC
- Main background is from neutrons, key goal for radcon is a dose rate of 1mrem/hr at the ceiling above the Gluex detector
- Discussion about the number of days required (currently 100 days in proposal)
- Next steps:
- get PAC approval
- for proposal may include for CPS: tagger area, first engineering changes for Hall D, simulations with CPS only
- evaluate different configurations for different number of days to address questions about required beam time