Meeting 10 April 2018
Jump to navigation
Jump to search
PRESENTATIONS
Revised draft 10-page document
Initial Draft of target sections (Donal/Dustin)
Draft of 10-page document updated after 4/10/18 meeting
NOTES
* Action items for next meeting on Tuesday, 24 April at 3:00pm (EST):
- Prepare drafts for remaining sections of the 10-page document (all, see section assignment)
- Start editing completed sections (Tanja, Thia, David?)
- Select figures for section V of 10-page paper - Jixie's web page and Parker's 4/10 presentation
- For all figures use convention: Target is at center of the hall
- Discussion Parker's presentation
- Shows that concept works
- good figures to demonstrate that: with CPS stop all photons from start already (stop activation)
- Activation after 100 or 1000 hours is effectively same
- Extra shielding looks well balanced in both forward and backward regions
- Discussion about 10-page draft from 4/10/18
- Fig. 2: change label for radiator
- Fig. 4: distribution power along absorber consistent with Fig. 2 - spread over many cm, come back to this in Fig. 6 to correlate where factor of 1000 reduction comes from and how one can decide with machinery from FLUKA/GEANT on shielding
- Engineering/Safety: consider as guidance for cost of CPS and distribution of cost items, main cost comes from W-powder
- Appendix 1: Add dose rate 2D figure
- Discussion about Dustin/Donal's section
- Target can withstand high radiation with suitable cooling and rotation