NPS ERR Prep 2/1/19
Jump to navigation
Jump to search
MAGNET
- Plan for mapping and running
- Safety and operation documents - can check with J. Beaufait, E. Folts, et al.
FRAME
- Timeline for construction and assembly, and resources
- Define alignment and survey requirements - how well do we need to know
- note that for NPS at 3-4m from target knowing position to mm is ~0.1mrad
CRYSTALS
- Expected number of crystals and when anticipate to have them
- Finalize layout with final number of SICCAS and CRYTUR crystals