NPS ERR Prep 2/1/19
Jump to navigation
Jump to search
MAGNET
- Plan for mapping and running
- Hi-pot testing, hydro testing, checklists, 5 G boundaries and field measurements, controls pre-checked out, measured vs calculated results, safety checks and controls, back out procedures
- Safety and operation documents - can check with J. Beaufait, E. Folts, et al.
FRAME
- Timeline for construction and assembly, and resources
- Define alignment and survey requirements - how well do we need to know
- note that for NPS at 3-4m from target knowing position to mm is ~0.1mrad
CRYSTALS
- Expected number of crystals and when anticipate to have them
- Finalize layout with final number of SICCAS and CRYTUR crystals
HALL C - MECHANICAL
- Strengthen bottom support, pivot
- Installation plan
HALL C - POWER AND CABLING
- Timeline for decisions and planning
HALL C - DAQ AND ELECTRONICS
- Trigger Bandwidth - highest rate expected from NPS (collaboration input)
- Dynamic range expected for signals (collaboration input)
HALL C - TRIGGER AND ELECTRONICS
- How software chain handles data rates - online monitoring
- Confirm ~4kHz rate on HMS side