ACTION ITEMS
SUMMARY NOTES
INTRODUCTION - ACTION ITEMS AND ERR (Tanja)
- For ERR in general need a list of outstanding scope and how/who will address it
- Discussion based on action item 2018 list in slides:
- page 1 items:
- Need an installation plan (Walter, Steve L. and team...)
- demonstrate that design complete and floor layout plan exists
- show what scope of work remains and who will do it
- show that fringe fields under control
- page 2 items:
- cabling - show that there is a plan how cables go on carriage
- page 3 items:
- what to show for software, DAQ, and electronics...
MAGNET UPDATE (Charles)
- Assembly done, ready for power and cooling - in test lab will get to 20% of power due to cooling limitations
- no need to power up before ERR
- plan to power up in summer
- June might be good time as tech teams should have more time then
- need to have estimate of fringe fields for magnet test area
- might want to check modeling magnet with and without base plate (concern is additional magnetic material) - might be ok with 20% energizing
- Mapper is ready for magnet tests
- need to start on safety documentation - J. Beaufait, E. Folts can help
- mapping plan is expected to be developed in first half of February - idea is to run without field and devise plan based on that
- Fringe fields
- show that no impact on beamline magnets - earlier studies showed that no impact, but might want to check again
- for ERR mainly need to show that have a plan
FRAME (Emmanuel)
- Design mostly ready - main question is who will do assembly
- Impact of cross talk in neighboring modules
- Ho-San measured 0.5% of light (from regular showers) goes from one to next crystal - expect same for LED
- Check on vertical clearance for PCB interface box - there may be interference with SHMS water lines
- For PMTs and electronics interface, need to know smallest signal size that still needs to be digitized
- Discussion crystal-PMT attachment and crystal array design
- Assume that silicone cookie will stick to either crystal or PMT when removing PMT
- Crystal array assembly is new - using aveoles (material only at first ~2cm along block, everywhere else along block 0.3mm air between crystals). Just put crystal inside, no compression.
- NOTE: to quantify shower leakage could run simulation and make shower profile with and without gaps
- Survey requirements
- standard is survey to 1mm on fiducial block on outside of frame
- For Hall A DVCS surveyed all block locations. Note that calorimeter was at 1m from target, so mm offset results in 1mrad
- calibration with e-p elastics possible? Need to check if can adjust calorimeter (in x, y, z) for these kinematics - in principle can do that with screw adjustments or shims
CRYSTALS (Vladimir)
- Discussion on crystal quality and tests
- Measured 2%/sqrtE with 3x3 prototype as expected given limitations of instrument - essentially have 8 edge crystals
- For NPS 12x12 prototype tests used temperature sensors on front and back of crystals
- Action Item: Make a spectrum of photon energy for crystals next to the one hit - should address question about smallest signal digitization - estimate is 2-3% of energy of hit crystal
- Saturation fADC - nominal voltage for linear range is 1100 V for HV divider, but this saturates. In Hall D tests ran with 650 V
- Rates comparable to NPS (250 kHz/channel)
- threshold >2 GeV overall (10-15mV/channel)