General Meeting Summary 2/21/19
Jump to navigation
Jump to search
NPS EXPERIMENT READINESS REVIEW
- Discussion about action items posted on Wiki
- HV divider: check for linearity at low voltages ongoing - focus on anode current
- Magnet: need plan for mapping and running, and safety documents, actual test may not be possible before ERR
- Trigger/electronics: need answer for how software chain handles data rates
- Discussion of ERR charge, agenda, presentations
- Safety documents: radiation budget submitted, need to edit COO (add RCs, etc.) ad ESAD (e.g. additional safety measured required for NPS)
- Agenda - confirm presentations on mechanical structure, electronics, beam line commissioning
- Planning: aim for a meeting in mid-April to go over rough structure of each talk (how many slides, content of slides); plan for a real dry run 1-2 weeks before the ERR
UPDATES
- Magnet (Bogdan)
- cooling, connections being worked on to get magnet ready for testing
- OSP: Charles agreed to write it
- additional safety measures implemented in light of recent magnet events
- Frame (Carlos)
- Mock-up constructed and tests of concept of accessing PMTs from back with boards on rails
- Got quartz fibers (1mm and 0.8mm diameters) to test radiation hardness - in general, fibers are very stiff (more than cables)
- Note that in the past glass fibers were only used for calibrations, e.g. 0.2mm diameter for PANDA, but for curing need larger diameter
- Carried out radiation resistance tests with Silicone cookies - they are radiation hard at high doses (30 Gy and >100 Gy)
- Crystals (Vladimir, Tanja)
- Received 18/55 crystals from CUA order - all pass initial inspection though mechanical quality slightly worse than previous 100 crystals from 2018
- Prototype data analysis ongoing
- Additional prototype data may be possible in next few days
- Simulation (Ho San)
- Nice plots of longitudinal shower profile with and without gaps - not significant difference at peak
- Impact of the gaps between crystals on resolution shown earlier - no significant impact as long as stay <~1mm
- For ERR plot of transverse shower profile might be good
- Mechanical design - update at next meeting
- Angle range of NPS remains at: 5.5 - 57 degrees, but small-to-large-angle changeover is now 23 degrees
NEXT MEETING: THURSDAY 7 MARCH AT 9:00 AM (ET)