General Meeting Summary 4/4/19
Jump to navigation
Jump to search
MAGNET (Charles, Bogdan, Rolf)
- Assembly and testing (Charles)
- Good progress with setting up for mapping tests, working on modifications for mounting the traveling stage
- OSP in progress - expect first draft on 4/8
- NPS Fringe Fields (Bogdan, Rolf)
- Discussion of slides
- Results show that a minor (mm-scale) vertical offset that can be taken into account in HMS optics as is standard practice
- Further mitigation of the already small vertical offset can be achieved with shielding; in this case no optics correction is needed
- Horizontal offsets are negligible
PMT AND DIVIDERS (Vladimir, Alex S.)
- Crytur crystals and modified/bypassed bases have been tested and installed in 3x3 prototype. Plan to install the prototype behind the pair spectrometer in Hall D on 4/8.
- Reduced gain (4-6 compared to 28) amplifiers are being prepared
- Anticipate some test time for modified amplifiers also with NPS prototype/ComCal at end of spring run
CRYSTALS (Vladimir, Tanja)
- Discussion of dimension comparison Crytur vs. SICCAS - both vendors were originally given specs: 20.5 +0.05/-0.05mm
- SICCAS mean globally higher than specs - would be consistent with 20.6 +0/-0.1mm
- CRYTUR mean is ~20.45mm, which is consistent with vendor requested and approved modified specs 20.5 +0/-0.1mm
- Crystal-to-crystal size variation is +/-0.05mm for Crytur and large fraction of SICCAS crystals, in particular the first 460 pieces
- Variation in size along the crystal for Crytur is 0.025mm
- REJECTION CRITERION: crystals will be rejected if larger than 20.6mm
- Optics tests of the 160 replacements SICCAS crystals are ongoing. Many fail light yield requirements.
FRAME (Carlos)
- Mock-up tests ongoing - identified issues with PCB board sliding and working on solutions
- Work on cable dimensions ongoing
- Mechanical calculations for carbon fiber structure supporting crystals ongoing - expect deformation on order 5-6um
SOFTWARE (Ho San)
- Adapting Hall A clustering/photon detection analysis software to NPS configuration
- Thinking of ways to expedite NPS analysis compared to Hall A? - e.g. better algorithms, higher speed
- Online data taking also important - Brad S is working on this
ERR PREPARATIONS
- Next meeting (4/18) will start with discussion of the speakers' rough content presentation slides - please prepare slide titles, table of contents or equivalent
- 4/18 meeting will be two hours
TCS UPDATE (Vardan)
- Presentation of ongoing simulation studies and results
NEXT MEETING: THURSDAY 18 APRIL 9:00-11:00 AM (ET)