General Meeting Summary 5/2/19
Jump to navigation
Jump to search
DISCUSSION OF DRAFT TALKS
TANJA
- Add experimental techniques for both sets of experiments
- Under General requirements: add electron beam energies (p.3) and statement that two separate configurations (SHMS right for angles below 23 deg and SHMS left) are needed (p.4)
STEVE W.
- Input on exact number of crystals (Tanja)
- Refer to Carlo's talk for discussion of frame and amplifiers including results from recent beam tests
- plan for frame delivery is summer 2020
- Time frame for detector placement and cabling - estimate is ~one month based on Hall A DVCS experience
- High level software - list INP-Orsay
- Radiator - same as for J/Psi, follow up with target group on details
STEVE L.
- Change "patch panel #1" to something like "cable support"
- Plan for transition from SHMS right to SHMS left configuration in backup
- Clarify spectrometer support group time, e.g. 100% available
- Ready to put slides into ERR specific template as needed
CHARLES
- Working on final slides - plan is to include further detail on: 1) plan for mapping and running and 2) safety and operation
CARLOS
- Working on final slides
- Input on exact number of crystals (Tanja)
BRAD S.
- Working on final slides
- Slow controls and LED subsystems - follow up with Carlos and Julie
- Communications with fast electronics group ongoing
JAY
- No changes to slides
GABRIEL