Summary 2/3/20
Jump to navigation
Jump to search
Notes by Charles Hyde •Summarize full to-do list in hall, and estimated time to completion •Estimate time for configuration changes during beam running •Document interferences between NPS, BeamLine, HMS ••Kinematic configurations are dynamic (addition of beam time from E12-06-114, uncertain beam energy in 2022) • How is the Calorimeter, Cabling, etc assembled