General EEEMCal Meeting Summary 6/7/21
Jump to navigation
Jump to search
PARTICIPANTS: Bruno Jorion, Carlos, Crytur CZ, Crytur USA, Douglas, Hamlet, Irina, Lei, Nathaly, Petr, Renee, Richard, Rosi, Vladimir, Gabriel, Miroslav, Pete, Sasha
EEEMCAL IN DETECTOR PROPOSALS
ATHENA
- Discussion about reuse of materials
- Implementation in simulation DD4HEP
- Action: Check with Dmitry what is implemented and plans for hybrid, overall dimensions
- Action: in two weeks need information on EEEMCal number blocks, cost, etc. - effectively an overview of EEEMCal
- Weekly meetings: Mondays 7pm ET
CORE
- Action: check in on EEEMCAL needs
ECCE
- IJCLab working on implementation in simulation
- Geometry done - flexible radius
- Implemented algorithms for energy resolution
- Studies of pion rejection
- Full simulations will include full event simulation
- Discussion of ECCE new configuration of DIRC/EEEMCal
- Actions:
- What is the eta coverage with the new DIRC/EEEMCal configuration?
- What is the change in rates?
- Send EEEMCal cost estimate to Carlos
- Weekly meetings: Tuesdays 8am ET
SIMULATIONS:
- EEEMCAL (Carlos): see point above
- Barrel EMCAL (Nathaly)
- Working on algorithms and analysis (energy resolution, optimization of length and width of blocks
- Pion rejection (Renee)
- Summer student starting today - setting up simulation
CRYTUR PWO+SIPM DETECTOR (Bruno, Olivier, Irina)
- Studies suggest that Hamamatsu S14160-3015PS SiPMs seem a good compromise - cost same, performance similar, and lead time is less than S14160-3010
- Action: post spreadsheet for checking numbers
- Envision 16 SiPM per crystal
- All components available commercially - boards design by Crytur
- SPI Supply +-5V per crystal
- SPI ADC supply voltage 50V/crystal tower --> action: check regulations at JLab for max voltage
NEXT MEETING: MONDAY 21 JUNE AT 8:30AM ET