INTRODUCTION

  • In Experiment Table move item E12-06-114 ("DVCS days moved from Hall A") to position #3
  • included in beam time request
  • part of Phase 1, but was not part of ERR in 2019
  • uses the same equipment
  • Hall C planning process for the next few years is ongoing
  • Mark has been talking to different groups and will try to make a decision soon
  • Action item: Mark check with Patrizia Rossi to get formal approval for E12-06-114


MECHANICAL DESIGN AND STATUS

  • Detector support structure - components in house and ready for assembly this SAD
  • Cable support: method with support running underneath the SHMS platform
  • Roof block cutting planned for this SAD
  • time estimate - 2 weeks (checked with Walter)
  • hole will be covered up with additional shielding
  • NPS installation timeframes (expectation from Project estimates)
  • HB removal - 2 weeks
  • HB re-install - 3 weeks
  • NPS initial install (SHMS right) - 50 days
  • NPS removal from right side - 3 weeks
  • NPS initial install (hardware) left side - 25 days
  • NPS moved from SHMS right side to left side (looking downstream) - 1 week including 3 days of radcon cooling if immediately after a run
  • Moving the sweeper magnet in same side setup will take a work day with survey support
  • Discussion about ground during welding to protect detectors
  • welding machines will be grounded to the hall floor
  • Schedule for SAD - some concerns about physics starting in June instead of July
  • Action items:
  • check again if grounded signals/HV cables are isolated from the frame
  • Mark check with Walter and Steven L. to make sure resources are available


DETECTOR SUPPORT GROUP

  • Overview of all DSG projects completed and ongoing: HV cables and testing, ESR pre-shaping, hardware monitoring, hardware interlock system (ongoing), signal monitoring, software configuration, thermal simulation (ongoing)
  • HV cables
  • Fabricated 40 cables, need 30, so have 10 spare HV cables
  • Estimate ~30 minutes for changing HV cables (turn off all HV in crate and unplug/plug)
  • Crystal temperature depends on ambient temperature - may be of interest to have additional temperature sensors on the inside of the detector box
  • discussion about where these would go - not much space inside the box
  • cooling is outside the frame
  • Action item:
  • Make model for placement of the temperature sensors inside the box and figure out cable routing


HV DIVIDERS