R&D Meeting Summary 8/30/22

From Cuawiki
Revision as of 14:27, 30 August 2022 by Hornt (talk | contribs) (Created page with "PARTICIPANTS: Marco B., Carlos, Tanja '''DISCUSSION OF ACTION ITEMS FROM LAST TIME''' '''IJCLAB-ORSAY''' * Completed testbench measurements of 10 SciGlass blocks (20cm lon...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

PARTICIPANTS: Marco B., Carlos, Tanja


DISCUSSION OF ACTION ITEMS FROM LAST TIME

IJCLAB-ORSAY

  • Completed testbench measurements of 10 SciGlass blocks (20cm long) produced earlier in late 2021 (5X) and early 2022 (2X) and working on report
  • Initial version can be found here Link
  • Notes from 8/23 topical meeting discussing results from the measurement Link
  • Sent 10 SciGlass blocks (20 cm long) to INFN
  • Working on subcontract with JSA
  • no delay in research activities expected


INFN

  • Received the 10 SciGlass blocks (20cm) and preparing for testbench measurements including SiPM readout
  • Discussion about student travel
  • two students available to work on SRO with SciGlass blocks
  • plan to match their travel with the CLAS collaboration meeting in early November - time at JLab can be used for designing and assembling the prototype and initial SRO tests. Data taking for SRO could be done in Spring 2023


CUA/JLAB

  • Initial measurements of 40cm blocks and preparations for prototype test ongoing
  • Performed initial transmittance measurements - longitudinal transmittance of 40cm blocks comparable to 2X series of 20cm blocks
  • Initial cosmic tests performed for signal validation
  • Blocks installed in 12x1 configuration for initial beam checkout


AANL

  • TH reports that AANL has been working on subcontract - need to follow up


PROGRESS REPORT AND PROPOSAL

  • Material for progress report:
  • Test bench measurements from Orsay
  • Test bench measurements with SiPM from INFN
  • Initial performance with beam
  • For a possible FY23 proposal need to consider that the focus is on EIC Project R&D (not generic) and any overlaps with the other Project R&D topics
  • Possible focus for FY23: full SciGlass block optimized in calorimeter
  • Topics/milestones for a possible FY23 proposal
  • Glass block/photosensor interface optimization (matrix and services)
  • Measure ratio of different time components of glass
  • Compare performance of different glass geometry shapes
  • Optimize
  • Documentation
  • Action items:
  • start drafting progress report and FY23 proposal
  • continue measurements and documentation

NEXT MEETING: TUESDAY 27 SEPTEMBER AT 1:00PM ET