Re: meeting about the NPS DAQ on Oct 24, 2022 at 11 am. Attending: Brad Sawatzky, Robert Michaels, Chris Cuevas, Alexandre Camsonne, William Gu, Ben Raydo, Bryan Moffit Note taker: Robert Michaels (Bob)
See also:
NPS main page https://wiki.jlab.org/cuawiki/index.php/Main_Page
NPS meetings: https://wiki.jlab.org/cuawiki/index.php/Main_Page#Meetings
Re: hall C DAQ: http://userweb.jlab.org/~rom/hallc
Topics I. How's it going with VTP/DAQ work in EEL-108 ? The VTP is basically ready. There is a production setup in the EEL building room 108. It uses CODA 3.10. The PXE boot mechanism for the ROCs is ready. The plan is to get the instrumented crates reading with a simple trigger and to test the system using synthesized loads. Needs a dedicated person. See manpower below. II. Design There is already a design, see the wealth of ERR talks, collaboration talks, and meeting notes on the URLs linked above. III. Parts to be ordered. We have all the equipment we need. We'll use a TI-master (William Gu to support it). First versions of firmware are written, simulated, and tested. IV. Manpower Bob Michaels is taking responsibility for organizing the hall C DAQ for now. Brad will consult. In the next few months, hopefully we'll have a new hire (we're supposed to hire 4 staff, at least one of whom would work on hall A and C DAQ). We will enjoy a significant amount of time from Bryan Moffit and Ben Raydo. Chris Cuevas expects NPS to be a priority. IV. Timeline The 3 NPS experiments start in July 2023 and run until March 2024. We need to be ready well in advance. The test setup in EEL-108 must demonstrate all the needed features. We also need to upgrade the HMS DAQ to CODA 3.10, and may as well upgrade the SHMS, too. V. Some details There are two vxWorks-based crates with CAEN 1190 for drift chambers that need to be ported to CODA 3.10 and Intel SBC. Bob is to give Bryan pointers to where the HMS/SHMS readout lists and libraries are. Bryan may work on those in the EEL-108 environment. Issues with the PMT bases are resolved, says Brad. FADC 250 firmware : The Hall C crates to use the Hall D firmware, while the NPS crates needs Hall B firmware as they are currently called. Boot infrastructure must support both firmwares. Concerns about the interconnects between crates and trigger, whether all cables are installed, working, tested. Chris's group may help. SBS DAQ also needs support. GeN-RP needs a lot of work. Hodoscope readout needs restored FADC. It's a long list. This is significant because of the limited manpower. Could use a student on NPS with good skill to learn DAQ work. Blocking mode: Needs to be implemented. Has implications for the analyzer. Mentioned in Brad's talks. Scaler readouts and helicity flag in light of blocking mode. Keep Brad in the loop on all developments.