SciGlass prototype 2022

From Cuawiki
Jump to navigation Jump to search

<-- Back to Beam Tests Main Page

People

  • CUA: Tanja Horn (superviser), Yeranuhi Ghandilyan, Joshua Crafts, VSL Team
  • JLab: Vladimir Berdnikov, Sasha Somov
  • AANL: Hakob Voskanyan, Arthur Mkrtchyan, Hamlet Mkrtchyan, Vardan Tadevosyan, ...
  • INFN: Marco Battaglieri, ...

Meetings

Physical characteristics of the glass

Physics

Visual inspection of the SciGlass modules

Dimensions

Transmission

cosmic test

Engineering part and design of the 3x3 prototype (40xm SciGlass 2022)

Hardware

Read out

- For the test we will need 25 cables (+3,4 spare)

- For the 5x5 prototype we will need to make 25 HV dividers

- LEMO connectors (FFS.00.250.NTCE52)

https://www.digikey.com/en/products/detail/lemo/FFS-00-250-NTCE52/3597392?s=N4IgTCBcDaIGJwMoDoAMrlgKwYHIBUBhAUSwgF0BfIA

- LEMO bulkhead connectors (PES.00.250.NTME31)

https://www.digikey.com/en/products/detail/lemo/PES-00-250-NTME31/3806969

- HV connectors (Pasternack SHV connector PE45556)

https://www.pasternack.com/shv-jack-rg174-rg316-rg188-connector-pe45556-p.aspx

- HV divider circuit boards + sockets

- Cables for dividers

Technical

- Label Machine

https://www.amazon.com/LABELWORKS-LW-PX300-Industrial-Label-Maker/dp/B08JQMFZ6F/ref=sr_1_29_sspa?crid=3BQBGDXQ8A5TJ&keywords=label+machine&qid=1667313715&qu=eyJxc2MiOiI1Ljg1IiwicXNhIjoiNS40MCIsInFzcCI6IjQuOTQifQ%3D%3D&sprefix=label+machine%2Caps%2C103&sr=8-29-spons&ufe=app_do%3Aamzn1.fos.006c50ae-5d4c-4777-9bc0-4513d670b6bc&psc=1

- Black RTV silicone

https://www.amazon.com/Permatex-81158-Black-Silicone-Sealant/dp/B000FW2NBM/ref=sr_1_7?keywords=black+rtv+silicone&qid=1667314270&qu=eyJxc2MiOiIzLjU5IiwicXNhIjoiMi45NyIsInFzcCI6IjIuNzUifQ%3D%3D&sprefix=Black+RTV+silic%2Caps%2C92&sr=8-7

- Black tape (0.68")

https://www.amazon.com/Wapodeai-Electrical-Temperature-Resistance-Waterproof/dp/B07ZWC2VLX/ref=sr_1_3_mod_primary_new?crid=3OYTWXT7MLYA5&keywords=black+tape+2.00%22%2C+101.60+mm&qid=1667313468&qu=eyJxc2MiOiIxLjU3IiwicXNhIjoiMC4wMCIsInFzcCI6IjAuMDAifQ%3D%3D&sbo=RZvfv%2F%2FHxDF%2BO5021pAnSA%3D%3D&sprefix=black+tape+2.00+%2C+101.60+mm%2Caps%2C103&sr=8-3

- Filament to print the box for 5x5 (PLA, 1.75mm)

https://urldefense.proofpoint.com/v2/url?u=https-3A__www.amazon.com_Polymaker-2DPolyLite-2DPrinter-2DFilament-2DPrinting_dp_B07PHTMZQT_ref-3Dsr-5F1-5F16-3Fcrid-3D1C2ROXS10LFTO-26keywords-3Dfilament-2Bblack-2Bpla-2Beconomy-2Bcolor-2Bfabb-2B1.75-2Bmm-2B3kg-26qid-3D1667224863-26qu-3DeyJxc2MiOiItMC4wMSIsInFzYSI6IjAuMDAiLCJxc3AiOiIwLjAwIn0-253D-26sprefix-3Dfilament-2Bblack-2Bpla-2Beconomy-2Bcolor-2Bfabb-2B1.75-2Bmm-2B3kg-252Caps-252C62-26sr-3D8-2D16&d=DwIFaQ&c=CJqEzB1piLOyyvZjb8YUQw&r=AX1P8R1V2r7WiE668wm4tw&m=0aCOb46vMHF1ovfzsOKqrD8Jasu60HNHwqSVkBfRbVvUltEXBl9RYKZcBxkhWBCC&s=B-wtwHSrzaJPxw1q0_FwVTcgr2Kr2zybqLhuZOBQVkE&e=

Construction of the 3x3prototype (40cm SciGlass 2022)

Installation of the 3x3 prototype (40cm SciGlass 2022) in the beam line (HallD) at Jefferson Lab

Beam alignment and re-alignment

Data from Prototype tests

Detailed List of Activities

Date?? - Visual inspection of the SciGlass "(Josh)"

09/16/2022 - Transmittance measurement (Josh, Yeran)

09/29/2022 - Dimensions measurement (Josh, Yeran)

09/29/2022 - Beam test with 12x1 array in the Hall, (Vlad, Arshak)

10/06/2022 - 12x1 array removing from the hall (Yeran, Arshak)

10/11/2022 - 3x3 prototype cosmic test in clean room, (Yeran, Arshak)

10/13/2022 - 3x3 prototype box assembling (Josh, Yeran)

10/14/2022 - 3x3 prototype installation in the hall and alignment (Yeran, Vlad, Arshak, Sasha)

10/18/2022 - 3x3 prototype re-alignment (5mm), (Yeran, Arshak, Sasha)

10/19/2022 - 3x3 prototype re-re-alignment (5+3mm), (Vlad, Arshak)

10/27/2022 - 3x3 prototype HV base replacement "(Yeran, Arthur, Arshak)" https://userweb.jlab.org/~yeran/SciGlass/3x3-HV.pdf

10/19/2022 - 3x3 prototype central channel's (#5) HV divider/base replacement "(Yeran, Arshak)" https://userweb.jlab.org/~yeran/SciGlass/3x3-HV-updated.pdf

11/05/2022 - decommissioning of 3x3 prototype with PMT's and preparations for attaching the SiPms (Yeran, Josh, Arthur)

Future Plans

https://docs.google.com/spreadsheets/d/1CwJVcIRDhr51JtxpQsakKK4meAIScLUfDkQquZgfOyk/edit#gid=0

October/27/2022 ---> Most probably on Thursday will be an access to the Hall-D. We are planning to change the HV dividers (to those with no pre-amplifier) and increase HV (from 1000 V to 1100 V) on the 3x3 prototype in order to improve the photodetection efficiency. Everything is ready to go to the Hall. Since there is no paper-based instruction for all this procedure, I'll try to make one for the future tests. https://userweb.jlab.org/~yeran/SciGlass/Towers+5mm+3mm.pdf


November/2/2022 ---> On Wednesday will be a accelerator maintenance day. We will have an access to the Hall and can release the 3x3 SciGlass prototype (with PMTs) and start SiPM test preparation. Our next step is beam test of SciGlasses with SiPMs in the HallD.