SciGlass prototype 2022

From Cuawiki
Revision as of 22:58, 15 January 2023 by Yeran (talk | contribs)
Jump to navigation Jump to search

<-- Back to Beam Tests Main Page

People

  • CUA: Tanja Horn (superviser), Yeranuhi Ghandilyan, Joshua Crafts, VSL Team
  • JLab: Vladimir Berdnikov, Sasha Somov
  • AANL: Hakob Voskanyan, Arthur Mkrtchyan, Hamlet Mkrtchyan, Vardan Tadevosyan, ...
  • INFN: Marco Battaglieri, Stefano Grazzi, Marco Spreafico, Mariangela Bondi

Meetings


Tuesday, 17.01.2023 11:00 am EST

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [1] Meeting ID: 160 406 7208 Passcode: 448495


Thursday 03.11.2022 at 12:30 EST

2x2cm, 40cm long SiGlass 5x5 array Prototype with SiPM for early 2023 Location: JLAB/ CC F226

zoom info: [2]


Thursday 03.11.2022, 9:00AM EDT (14:00 Rome)

2x2cm, 20cm long SiGlass 3x3 array Prototype for SRO tests with cosmics

Location: JLAB/ CC F226

zoom info: [3] Agenda: to touch base and verify the status of the different components (Sergey: hw and deployment in Hall-B, Vardan: ERSAP, Carmelo: Tridas).


cosmic test

Engineering part and design of the 3x3 prototype (40xm SciGlass 2022)

Hardware

''Read out for '''PMT based''' 5x5 SciGlass prototype''

- For the test we will need 25 cables (+3,4 spare)

- For the 5x5 prototype we will need to make 25 HV dividers

- LEMO connectors (FFS.00.250.NTCE52) [4]

- LEMO bulkhead connectors (PES.00.250.NTME31) [5]

- HV connectors (Pasternack SHV connector PE45556) [6]

- HV divider circuit boards + sockets

- Cables for dividers

''Technical/Additional''

- Label Machine [7]

- Black RTV silicone [8]

- Black tape (0.68") [9]

- Filament to print the box for 5x5 (PLA, 1.75mm) [10]

''Readout for '''SiPM based''' 5x5 SciGlass Prototype''

Action items

• Identify one additional fADC (adds 16 channels) for the beam test – Vladimir

• For “standard” (SiPM and NO SRO) readout need from Fernando additional cables (50ft) – Yeran

Available parts:

S13360-6025PS – 36 pc

S13360-6075PS – 20pc

S14160-6050HS – 150pc

S14160-6050HS-04 – 16pc

fADC – 1x (16 channels)

HV/signal cables – 10 channels

FEE: 12 preamps from INFN, 4 Bias PCB (16 channels) from INFN

Construction of the 3x3prototype (40cm SciGlass 2022)

Installation of the 3x3 prototype (40cm SciGlass 2022) in the beam line (HallD) at Jefferson Lab

Beam alignment and re-alignment

Data from Prototype tests

Detailed List of Activities

Date?? - Visual inspection of the SciGlass "(Josh)"

09/16/2022 - Transmittance measurement (Josh, Yeran) Comparison of 9 blocks produced in summer 2022


09/29/2022 - Dimensions measurement (Josh, Yeran) [11]

09/29/2022 - Beam test with 12x1 array in the Hall, (Vlad, Arshak)

10/06/2022 - 12x1 array removing from the hall (Yeran, Arshak)

10/11/2022 - 3x3 prototype cosmic test in clean room, (Yeran, Arshak)

10/13/2022 - 3x3 prototype box assembling (Josh, Yeran)

10/14/2022 - PMT based 3x3 prototype installation in the hall and alignment (Yeran, Vlad, Arshak, Sasha)

10/18/2022 - 3x3 prototype re-alignment (5mm), (Yeran, Arshak, Sasha)

10/19/2022 - 3x3 prototype re-re-alignment (5+3mm), (Vlad, Arshak)

10/27/2022 - 3x3 prototype HV base replacement "(Yeran, Arthur, Arshak)" [12]

10/29/2022 - 3x3 prototype central channel's (#5) HV divider/base replacement "(Yeran, Arshak)" [13]

11/02/2022 - Removing PMT based 3x3 prototype from the Hall, for replacing MPT's with the SiPms and make a beam test in the Hall, (Yeran, Arthur, Vlad, Sasha)

11/05/2022 - Detaching PMTs from the 2x2cm, 40cm long SciGlass modules and preparations for attachement the SiPms (Yeran, Josh, Arthur)' [14]

11/21/2022 - Attachemnet of SiPMs to the SciGlass and Prototype assembly (Yeran, Josh, Arthur) [15]

12/14/2022 - SiPM based 3x3 prototype installation in the hall and alignment (Yeran, Arshak) [16]

12/19/2022 - Removing SiPM based 3x3 prototype from the Hall, (Yeran, Arshak)

12/21/2022 - Moving 9 SciGlasses to Genova (INFN) (Yeran, Marco B.) [17]

Future Plans

SciGlass Task List 2022

October/27/2022 ---> Most probably on Thursday will be an access to the Hall-D. We are planning to change the HV dividers (to those with no pre-amplifier) and increase HV (from 1000 V to 1100 V) on the 3x3 prototype in order to improve the photodetection efficiency. Everything is ready to go to the Hall. Since there is no paper-based instruction for all this procedure, I'll try to make one for the future tests. [18]


November/2/2022 ---> On Wednesday will be a accelerator maintenance day. We will have an access to the Hall and can release the PMT based 3x3 SciGlass prototype and start SiPM test preparation. Our next step is beam test of SciGlass with SiPMs.

November-December 2022 ---> SiPM based 3x3 SciGlass (2x2cm, 40cm long) prototype beam test in the Hall.

January 2023 ---> SiPM based 5x5 SciGlass (2x2cm, 40cm long) prototype beam test in HallD.

• If there is an additional glass block made already, bring it to JLab on 11/4 for Marco to take back to Italy for initial tests – Josh

• Check on development of 2x2 SiPM matrix (Fernando’s group) - Josh

• Start initial tests with 1 block SciGlass (if available) – Marco and team

• Develop documentation for HallD for the 5x5 prototype tests – Yeran