SciGlass prototype 2022

From Cuawiki
Jump to navigation Jump to search

<-- Back to Beam Tests Main Page

People

  • CUA: Tanja Horn (superviser), Yeranuhi Ghandilyan, Joshua Crafts, VSL Team
  • INFN: Marco Battaglieri, Marco Spreafico, Mariangela Bondi, Giacomo Ottonello, Stefano Grazzi,
  • JLab: Sasha Somov, Vladimir Berdnikov
  • AANL: Hamlet Mkrtchyan, Vardan Tadevosyan, Arthur Mkrtchyan

Meetings

Wednesday 01.08.2023 11:00am EST

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [1] Meeting ID: 160 317 6325 Passcode: 450782)

Meeting notes []


Wednesday 01.02.2023 11:00am EST

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [2] Meeting ID: 160 317 6325 Passcode: 450782)

Meeting notes [3]


Monday 20.02.2023 11:00am EST

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [4] Meeting ID: 160 406 7208 Passcode: 448495)

Meeting notes [5]


Monday 13.02.2023 11:00am EST

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [6] Meeting ID: 160 406 7208 Passcode: 448495)

Meeting notes [7]


NEXT MEETING: THURSDAY FEBRUARY 2 AT 1:00PM ET (postponed on MONDAY, February 6, 11am) )

zoom info: [8] Meeting ID: 160 406 7208 Passcode: 448495)

Meeting notes [9]


Tuesday 24.01.2023 11:00am EST

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [10] Meeting ID: 160 406 7208 Passcode: 448495)

Meeting notes [11]


Tuesday, 17.01.2023 11:00 am EDT (14:00 Rome)

Update on the 5x5 prototype assembly and checklist for the upcoming beam test at JLAB

zoom info: [12] Meeting ID: 160 406 7208 Passcode: 448495)

Meeting notes [13]


Thursday 03.11.2022 at 12:30 EST

2x2cm, 40cm long SiGlass 5x5 array Prototype with SiPM for early 2023 Location: JLAB/ CC F226

zoom info: [14]


Thursday 03.11.2022, 9:00AM EDT (14:00 Rome)

2x2cm, 20cm long SiGlass 3x3 array Prototype for SRO tests with cosmics

Location: JLAB/ CC F226

zoom info: [15] Agenda: to touch base and verify the status of the different components (Sergey: hw and deployment in Hall-B, Vardan: ERSAP, Carmelo: Tridas).


3x3 prototype (20x20x400mm)

Hardware

- LEMO connectors (FFS.00.250.NTCE52) [16]

- LEMO bulkhead connectors (PES.00.250.NTME31) [17]

- HV connectors (Pasternack SHV connector PE45556) [18]

- HV divider circuit boards + sockets

- Cables for dividers

''Technical/Additional''

- Label Machine [19]

- Black RTV silicone [20]

- Black tape (0.68") [21]

- Filament to print the box for 5x5 (PLA, 1.75mm) [22]

''Readout for '''SiPM based''' 5x5 SciGlass Prototype''

Action items

• Identify one additional fADC (adds 16 channels) for the beam test – Vladimir

• For “standard” (SiPM and NO SRO) readout need from Fernando additional cables (50ft) – Yeran

Available parts:

S13360-6025PS – 36 pc

S13360-6075PS – 20pc

S14160-6050HS – 150pc

S14160-6050HS-04 – 16pc

fADC – 1x (16 channels)

HV/signal cables – 10 channels

FEE: 12 preamps from INFN, 4 Bias PCB (16 channels) from INFN



3x3 SciGlass prototype beam test timeline

SciGlass Task List 2022

Detailed List of Activities

09/16/2022 - Transmittance measurement (Josh, Yeran) Comparison of 9 blocks produced in summer 2022

09/29/2022 - Dimensions measurement (Josh, Yeran) [23]

09/29/2022 - Beam test with 12x1 array in the Hall, (Arshak, Vlad)

10/06/2022 - 12x1 array removing from the hall (Yeran, Arshak)

10/11/2022 - 3x3 prototype cosmic test in clean room, (Yeran, Arshak)

10/13/2022 - 3x3 prototype box assembling (Josh, Yeran)

10/14/2022 - PMT based 3x3 prototype installation in the hall and alignment (Yeran, Arshak, Sasha, Vlad)

10/18/2022 - 3x3 prototype re-alignment (5mm), (Yeran, Arshak, Sasha)

10/19/2022 - 3x3 prototype re-re-alignment (5+3mm), (Arshak, Vlad)

10/27/2022 - 3x3 prototype HV base replacement. The HV dividers have been replaced to those with no pre-amplifier and increase HV (from 1000 V to 1100 V) on the 3x3 prototype in order to improve the photodetection efficiency. "(Yeran, Arthur, Arshak)" [24], [25]

10/29/2022 - 3x3 prototype central channel's (#5) HV divider/base replacement "(Yeran, Arshak)" [26]

11/02/2022 - Removing PMT based 3x3 prototype from the Hall, for replacing MPT's with the SiPms and make a beam test in the Hall, (Yeran, Arthur, Sasha, Vlad)

11/05/2022 - Detaching PMTs from the 2x2cm, 40cm long SciGlass modules and preparations for attachement the SiPms (Yeran, Josh, Arthur)' [27]

11/21/2022 - Attachemnet of SiPMs to the SciGlass and Prototype assembly (Yeran, Josh, Arthur) [28]

12/14/2022 - SiPM based 3x3 prototype installation in the hall and alignment (Yeran, Arshak) [29]

12/19/2022 - Removing SiPM based 3x3 prototype from the Hall, (Yeran, Arshak)

12/21/2022 - Moving 9 SciGlasses to Genova (INFN) (Yeran, Marco B.) [30]

5x5 prototype (20x20x400mm)


Measurements

Visual Inspection [31]

Dimension [32]

Transmission [33]


Prototype construction [34]


Simulations [35]


Cosmic test [36] [37]


Beam test

(5x5 prototype installation in HallD)


Data analysis


Documentation

5x5 SciGlass prototype beam test detailed plan/activities/timeline [38]

5x5 SciGlass prototype beam test documentation [39]

5x5 SciGlass prototype beam test timeline [40]