PARTICIPANTS: Justin, Josh, Renee, Richard, Tanja, Sasha, Rosi, Carlos, Joerg, Ioana, Crytur-USA, Douglas, Pete


MECHANICAL DESIGN

  • Work ongoing
  • to proceed waiting for decisions on electronics/RO and interfaces with external infrastructure (supports, other detectors, etc.)
  • Prototypes for beam test campaigns
  • IJCLab-Orsay 5x5 prototype with cooling
  • MIT 5x5 prototype with cooling
  • Crytur-USA 3x3 prototype with 15um SiPM 3x3mm3 devices (16/crystal)
  • Possible beam tests - ongoing planning
  • JLab Hall D is available September 2024 - May 2025
  • CERN - discussions with Norbert; this would be mixed beam
  • DESY
  • Action items:
  • request time for Hall D prototype testing
  • follow up on CERN beam time
  • follow up with Douglas on beam test possibilities at DESY in summer 2024
  • Pion/hadron beams
  • presently considering measuring hadron response with low energy proton beam
  • perhaps the CERN beam can serve as pion beam test


READOUT/ELECTRONICS

  • Irradiation of SiPMs
  • there is a facility at UMass-Lowell that has been used for sPHENIX - a fee is required to use this facility
  • tests are presently being planned through collaboration with Giessen U. at low energy hadron beam facilities
  • Discussion of needed performance parameters