PARTICIPANTS: Tristan, Carlos, Tanja, Hamlet, Crytur USA, Renee, Matthew Nguyen, Douglas, Gerard, Joerg, Larry, Ioana, Vardan, Sasha, Shihai Jia, Hrachya Marukyan, Crytur CZ, Josh, Artur Hoghmrtsyan, Rosi, Julie,


OVERALL UPDATES

  • Started a document on EEEMCAL that may serve as pre-briefing material for final design review and/or publication
  • No news on NSF pre-proposal (see notes below)
  • Notes from DSC-ePIC meeting on 2/7 posted in Wiki


BEAM TEST DESY - FEBRUARY

  • Things going smoothly. A few downtimes but nothing major
  • Energy resolution with small collimator (2mm x 2mm) is much smaller than the quoted in the paper, regardless of beam energy
  • the number of 150 MeV form the paper was done in T21 test area and with a 18mm x 18mm collimator
  • ASIC readout
  • 400 SiPMs (16 per channel) - have tested all of them and all are working
  • Found some dead channels in the ASICS - re-arranged elements so that all but one SiPM have a working ASIC channel
  • Have seen signals and have been running calibrations
  • Started with independent (read out each channel individually) readout and have been doing energy (1-5 GeV, no rate at 6 GeV) and position scans (around central crystal) across the calorimeter
  • Central crystal with one SiPM gets resolution of ~10% at 1 GeV
  • Took data to gain match each of the channels so that can gain match and then
  • Can output only one crystal and plugged that into MIT readout with digitizer (not ASIC) - get same resolution as with the ASIC readout
  • Finished data taking on the individual SiPM with ASIC readout
  • Two more test: 1) 4x4 grouped SiPM, 2) FPGA
  • gain test SiPMs individually
  • figure out which events are read out in SRO
  • Discrete readout
  • initial test with single crystal and PMT in beam
  • discrete readout boards inserted into Orsay prototype and started tests - saw data on all channels
  • Planning to follow run plan for the next few days


BEAM TEST DESY - MARCH

  • Start is 24 March
  • Actions for preparation:
  • Send email to Douglas (hasell@mit.edu) if planning to participate
  • Note: if at DESY for the first time need to complete a safety lecture - only offered on Mondays at 1pm local time
  • Complete DESY registration form, which will be sent after Douglas registered participants in the system
  • Make DESY hostel reservations
  • Plan to have beam test preparation meetings in the next few weeks


NSF PROPOSAL

  • Due date is still listed as 19 March
  • Might be good to reach out to SPOs to say that planning to submit
  • Plan to start edits to Overleaf proposal document in the next few weeks
  • edit Broader Impacts section and edit language in entire proposal
  • edit sections pertaining to timelines etc. that may have changed since the last submission


NEXT MEETING: FRIDAY 21 MARCH AT 8:00AM ET (THERE WILL BE SUBGROUP MEETING ON BEAM TEST AND PROPOSAL - SEE EMAIL)