Difference between revisions of "Detailed List of Activities"

From Cuawiki
Jump to navigation Jump to search
(Created page with "Visual inspection of the SciGlass date?? Josh?? Transmittance measurement ''September 16 (Josh, Yeran)'' Dimensions measurement ''September 29 (Josh, Yeran)'' Module assem...")
 
Line 1: Line 1:
 +
[https://wiki.jlab.org/cuawiki/index.php/EEEMCal_Beam_Tests#Work_done Back to Beam Tests Page]
 +
 
Visual inspection of the SciGlass date?? Josh??
 
Visual inspection of the SciGlass date?? Josh??
  

Revision as of 17:22, 23 October 2022

Back to Beam Tests Page

Visual inspection of the SciGlass date?? Josh??

Transmittance measurement September 16 (Josh, Yeran)

Dimensions measurement September 29 (Josh, Yeran)

Module assembly October 13 (Josh, Yeran)

Beam test with 12x1 array in the Hall, September 29 (Vlad, Arshak)

12x1 array removing from the hall October 6 (Yeran, Arshak)

3x3 prototype cosmic test in clean room, October 11 (Yeran, Arshak)

3x3 prototype box assembling October 13 (Josh, Yeran)

3x3 prototype installation in the hall and alignment October 14 (Yeran, Vlad, Arshak, Sasha)

3x3 prototype re-alignment (5mm), October 18 (Yeran, Arshak, Sasha)

3x3 prototype re-re-alignment (5+3mm), October 19 (Vlad, Arshak)