Difference between revisions of "EIC-24-April-24-minutes"

From Cuawiki
Jump to navigation Jump to search
Line 9: Line 9:
  
 
<li> <font color="green"><b>General Points</b></font>:<br>
 
<li> <font color="green"><b>General Points</b></font>:<br>
* E. Sidoretti: improvements for the "camerona". The two FECs are now working. The HV has been connected to try the noise. The APVs are non the lateral bands (two boards). If a pedestal is done, the noise is under a threshold. There is a defect regarding an asymmetry between odd and even channels (under 45-50 adc), see [https://wiki.jlab.org/cuawiki/images/b/bb/WhatsApp_Image_2024-04-23_at_13.01.59.jpeg photo]. Red is a board and black is the other one, i.e. the X and the Y readout. We can notice a shift between odd (low noise) and even (high noise) channels. This is likely due to the fact that even channels are connected close to the mass, see [photo].
+
* E. Sidoretti: improvements for the "camerona". The two FECs are now working. The HV has been connected to try the noise. The APVs are non the lateral bands (two boards). If a pedestal is done, the noise is under a threshold. There is a defect regarding an asymmetry between odd and even channels (under 45-50 adc), see [https://wiki.jlab.org/cuawiki/images/b/bb/WhatsApp_Image_2024-04-23_at_13.01.59.jpeg photo]. Red is a board and black is the other one, i.e. the X and the Y readout. We can notice a shift between odd (low noise) and even (high noise) channels. This is likely due to the fact that even channels are connected close to the mass, see [photo]. In the next steps the camerona will likely go to the oven and then it will be filled with gas.
  
 
* A. D'Angelo: news for the orders and for the coordination.
 
* A. D'Angelo: news for the orders and for the coordination.

Revision as of 05:37, 24 April 2024

Meeting report for ePIC-EIC Roma2, April 24, 2024

Coordination Meeting

    Attending: R. Ammendola, B. Benkel, M. Bondì, A. D'Angelo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi.
  1. General Points:
    • E. Sidoretti: improvements for the "camerona". The two FECs are now working. The HV has been connected to try the noise. The APVs are non the lateral bands (two boards). If a pedestal is done, the noise is under a threshold. There is a defect regarding an asymmetry between odd and even channels (under 45-50 adc), see photo. Red is a board and black is the other one, i.e. the X and the Y readout. We can notice a shift between odd (low noise) and even (high noise) channels. This is likely due to the fact that even channels are connected close to the mass, see [photo]. In the next steps the camerona will likely go to the oven and then it will be filled with gas.
    • A. D'Angelo: news for the orders and for the coordination.