A. D'Angelo: the review to assess the readiness for the TDR was completed last week and the answer is available. The deadline to produce the TDR is July, the checks will be done in December. It has to be ready for April 2025.  
+
A. D'Angelo: the review to assess the readiness for the TDR was completed last week and the answer is available. The deadline to produce the TDR is July (to be written with the possibility to add changes at request), the checks will be done in December. It has to be ready for April 2025.
R. Ammendola: yesterday a meeting with M. Contalbrigo and Roma 1 group was held. This was a general meeting about the simulations status.
+
As for the acquisition system we now have two functioning FECs.
L. Lanza: Confluence page is ready, team members can registrate:
+
R. Ammendola: yesterday a meeting for DRICH with M. Contalbrigo and Roma 1 group was held. This was a general meeting about the simulations status.
 +
L. Lanza: Confluence page is ready, team members can proceed with registration:
  
https://confluence.infn.it/display/ePICmpgd/ePIC_MPGD
+
* https://confluence.infn.it/display/ePICmpgd/ePIC_MPGD
  
https://confluence.infn.it/display/ePICmpgd/Electron-Ion+Collider+Detectors%3A+MPGD+ECT
+
And the specific page is:
 +
 
 +
* https://confluence.infn.it/display/ePICmpgd/Electron-Ion+Collider+Detectors%3A+MPGD+ECT
  
  

Latest revision as of 06:21, 27 March 2024

Meeting report for ePIC-EIC Roma2, March 27, 2024

Coordination Meeting

    Attending: R. Ammendola, B. Benkel, A. D'Angelo, A. Fantini, L. Lanza, E. Sidoretti.
  1. General Points:
    A. D'Angelo: the review to assess the readiness for the TDR was completed last week and the answer is available. The deadline to produce the TDR is July (to be written with the possibility to add changes at request), the checks will be done in December. It has to be ready for April 2025. As for the acquisition system we now have two functioning FECs. R. Ammendola: yesterday a meeting for DRICH with M. Contalbrigo and Roma 1 group was held. This was a general meeting about the simulations status. L. Lanza: Confluence page is ready, team members can proceed with registration: And the specific page is: