Difference between revisions of "Electron-Ion Collider Detectors: MPGD ECT"

From Cuawiki
Jump to navigation Jump to search
Line 173: Line 173:
 
|   [https://clasweb.jlab.org/wiki/index.php/EIC-13-March-24-minutes March 13, 2024]
 
|   [https://clasweb.jlab.org/wiki/index.php/EIC-13-March-24-minutes March 13, 2024]
 
|   [https://clasweb.jlab.org/wiki/index.php/EIC-20-March-24-minutes March 20, 2024]
 
|   [https://clasweb.jlab.org/wiki/index.php/EIC-20-March-24-minutes March 20, 2024]
|   [https://clasweb.jlab.org/wiki/index.php/EIC-27-March-24-minutes March 27, 2024]
+
|   [https://wiki.jlab.org/cuawiki/index.php/EIC-27-March-24-minutes March 27, 2024]
 
<!--
 
<!--
 
|-
 
|-

Revision as of 06:21, 27 March 2024

ePIC - EIC - Roma2 Group

MPGD endcap for ePIC

Screenshot 2024-03-12 alle 15.11.13.png

Participants:

  • University Roma Tor Vergata and INFN Roma Tor Vergata: R. Ammendola, B. Benkel, A. D'Angelo, R. Di Salvo, A. Fantini, L. Lanza, G. Nobili, E. Sidoretti, E. Tusi
  • INFN Catania: M. Bondì

General Information

Zoom meeting:

https://jlab-org.zoomgov.com/j/16161557979?pwd=SUxJUjF3cmF1S0swV3ZtMForTWRKUT09


ePIC - EIC Roma2 MPGd endcaps - To Do list

Detector Geometry Studies

Activity Persons in charge
Understand the Mechanical envelope available for uRwell endcaps Seung Joon (JLab)
Define the detector active area ...
Final segmentation – 4 quadrants vs 2 semi-circles ...
Servings & Cooling Seung Joon (JLab)
Electronic cables Irakli Damien (Saclay)
Geometrical Constraints for/of SALSA FEB Saclay group - Roberto Ammendola
Read-out system definition (X,Y) vs (R,phi) , pitch ...
Material budget assessment ( with/without GEM preamplifier) ...
Gap-size definition (with or without GEM foil) ...
Mounting procedure and related constraints ...

Simulations and software

Activity Persons in charge
Detector geometry simulation Mariangela, Matt, Lucilla
Detector response simulation Mariangela, Matt, Lucilla
Data analysis algorithm: standard cluster reconstruction and uTPC version Bruno, Rachele
Inclusion of endcap response in the ePIC tracking Bruno, Rachele
Final performances assessment ...

Integration and Hardware

Activity Persons in charge
On-Line Calibration -> Alignment -> SVT/Tracking->TIC: survey/photogrammetry plans – targets to be installed ...
Study of stability against magnetic field forces (2 Tesla) (carbon fiber support) ...
Detector Support and mounting scheme ...

R&D prototype tests

Activity Persons in charge
SRS DAQ set-up Elena
SRS data analysis framework (corrywreckan..) Elena
Gas handling system ...
Humidity probes Elena+ Giulietto
HV supply ...


Plastic scintillators and DAQ trigger ...
Trigger NIM daisy chain (low thr discr, coincidence unit, dual timer, logic fan in fan out) ...
Reference trackers set-up (CS 2D detectors?) Elena
On-line monitoring - Labview ...
Mechanical structure ...

Group meetings in 2024

  March 6, 2024   March 13, 2024   March 20, 2024   March 27, 2024

Useful Links