General EEEMCal Meeting Summary 4/5/21

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

PARTICIPANTS: Hamlet, Tanja, Gabriel, Carlos, Cristiano, Rosi, Douglas, Admin, Renee, Hrachya, Lei, Vardan, Richard, Miroslav

JMU INTRODUCTION (Gabriel Niculescu)

  • Large undergrad serving institution
  • Long track record in hadron physics
  • Expertise: simulations, designing, building, and testing detectors and detector components (PMTs mostly)


UPDATES FROM ECCE, EICIP6, IR2, CORE, etc.

  • CORE (Carlos)
  • invited for presentation on PWO
  • CORE is aiming for large area PWO coverage - endcap plus some of barrel
  • ECCE SIMULATIONS MEETING (Rosi, Carlos)
  • EEEMCal needs to be implemented in Fun4All - Orsay team has started initial investigation
  • EIC@IP6 INSTITUTIONAL BOARD (All)
  • Starting to assemble institutional board
  • Will have frequent meetings
  • Actions:
  • EEEMCal nominate a calorimeter convener
  • Institutional board meeting representative for EEEMCal: Renee
  • Fill out spreadsheet: check RECAL, under hardware interests: "EM Calorimeter (EEEMCAL)"
  • SUPPORT STRUCTURE (Tanja)
  • Invited to a meeting on 3D model/visualization of detector organized by the project. The general aim to define outer structures for the electron endcap calorimeter (support/mounting points, integration with DIRC readout)
  • Josh Crafts (student/tech at CUA) presented the CAD model of the Hall D FCAL as a possible starting point for the electron endcap calorimeter support structure
  • Action:
  • check on EEEMCAL participation in future 3D model/visualization meetings
  • SIMULATIONS (Cristiano)
  • Implementation of EEEMCAL in simulations ongoing or complete (ESCALATE, FUN4ALL)
  • Optimization implemented in Escalate - on top of the simulation - that pipeline is basically ready


  • PROTOTYPE TESTS (Douglas, Tanja)
  • JLab tests expected starting August 23 and running into December 2021 (8 weeks + 7.5 weeks) - EEEMCAL anticipated to run ~3 weeks in the first period and ~4 weeks in the second period. For more information on all planned prototype tests at JLab see this link
  • Period 1:
  • mRICH + GEMTRD/MPGD
  • EEEMCal1 + GEMTRD/MPGD
  • OTRFT + GEMTRD/MPGD
  • Period 2:
  • OTRFT + GEMTRD/MPGD
  • EEEMCal2 (+ GEMTRD/MPGD pending further discussions)
  • EEEMCal3/TPEX 5x5
  • DESY tests being planned for fall 2021 - expect ~2 weeks EEEMCal tests (streaming readout - test different boards)
  • Workshop on streaming readout at end of April - Douglas will send out more information
  • Discussion Research outline (all)
  • Action:
  • each group look over and tweak as needed
  • Add paragraph at the end to make clear that aware of proposal initiatives and how EEEMCal would fit into each; engagement in these detector proposals


NEXT MEETING: MONDAY 19 APRIL AT 8:30AM ET