General EEEMCal Meeting Summary 7/26/21

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

PARTICIPANTS: Carlos, Cristiano, Crytur, Douglas, Hamlet, Hrachya, Lei, Miroslav, Renee, Richard, Vladimir, Tanja, Rosi,

EEEMCAL IN THE DETECTOR PROPOSALS

ATHENA

  • August 1st planned for first simulation campaign
  • Opportunity for people to validate calorimeter performance in ATHENA framework


ECCE

  • AI supported optimization - in process of getting started
  • First simulation campaign included PWO - initial validation completed


SIMULATION UPDATE (Kheagan, Renee)

  • Electron ID and Background studies
  • e/pi separation
  • pair symmetric background
  • Started with EEEMCal response in ECCE - next could be ATHENA and CORE
  • e/pi very challenging in barrel with current configuration
  • Action:
  • extract resolution for calorimeter and tracking and compare to Yellow Report to see if fulfill requirements


EEEMCAL DESIGN

  • Attachment concept developed - now studying in detail
  • Cooling combined: EEEMCal frame and from back
  • need also maintain temperature
  • Actions:
  • check on allowable load
  • Crytur prototype: check dissipation of heat from electronics
  • INFN prototype: check impact on resolutoin of locating electronics at 15m away
  • Impact of aging on heat output - estimation of additional heat output from sphenix?


SIPM+PWO DETECTOR

  • Design ongoing
  • Aim for including variety of features that will provide information for large detector, e.g., trying to monitor and/or regulate gain/bias and monitor temperature of each channel


BEAM TESTS

  • JLAB: prototypes ready, two test beam periods (September ~6-27, November 15-end of run in December)
  • DESY: preparations ongoing, prototype expected to be shipped in September


NEXT MEETING: MONDAY 9 AUGUST AT 8:30AM ET