Difference between revisions of "General Meeting Agenda 11/12/20"

From Cuawiki
Jump to navigation Jump to search
Line 5: Line 5:
  
 
* NPS software
 
* NPS software
 +
 +
* [[Media:Floor_Diagram_draft.pdf|Draft NPS Assembly Floor Space Layout]] (Brad)
 +
::* Walt Akers will work with us to get needed space in either the ESB or TestLab.  Rough schedule for this would help get us in the queue.
  
 
* Collaboration meeting 2021
 
* Collaboration meeting 2021
  
 
* Other
 
* Other

Revision as of 20:27, 11 November 2020

DISCUSSION ITEMS

  • Subsystem and support group updates
  • NPS software
  • Walt Akers will work with us to get needed space in either the ESB or TestLab. Rough schedule for this would help get us in the queue.
  • Collaboration meeting 2021
  • Other