General Meeting Agenda 3/7/24

From Cuawiki
Revision as of 16:25, 26 March 2024 by Hornt (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

DISCUSSION MATERIAL - NPS REMOVAL 2024

  • NPS Component Storage in the JLab Site Plan Detail Image
  • The Magnet will go to the test lab, by CLEO magnet. (58)
  • calorimeter will go into the ESB. (23)
  • Cables may go into PSB. (72)
  • the majority of the rest will go into a Fabric housing near the canon gate. (64)