General Meeting Summary 1/17/19

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

NPS COLLABORATION MEETING - 1 FEBRUARY

  • Discussion draft agenda
  • reduce talk time
  • leave breaks - need ~1hour for lunch
  • Discussion presentation template for ERR related talks


EXPERIMENT READINESS REVIEW (ERR)

  • Discussion of draft charge
  • Items that need more detailed discussion are points 4, 5, 7, 8, and 9
  • Point 4: define pieces and responsibilities
  • Point 7: need generated radiation levels, submit preliminary radiation assessment documentation?
  • Point 8: Readiness for calorimeter analysis
  • Point 9: Documentation (RSAD, COO, ESAD, OSP) - OSP probably for magnet and calorimeter, define what is needed and who will be responsible
  • Action items:
  • Have preliminary drafts of documentation
  • Prepare task list for 1 Feb collaboration meeting
  • ERR dates - send suggestions for dates in frame March-April to Patrizia


MAGNET UPDATE (Bogdan)

  • Magnet ready, water lines have been connected
  • Power supply - plan s to energize within next week


FRAME UPDATE (Carlos)

  • Good progress on assembly of modules (2 x 2)
  • improved assembly/disassembly mechanics and procedure, e.g. captive screw that will stay attached to the frame and not fall when trying to disassemble
  • still looking into some details of attaching fiber, e.g. glue to either crystal or frame
  • Design of PCB boards is complete and ready for production
  • LEDs on board, short fiber to crystal, control LED by flat cables
  • signal connectors are one end SMA (similar size to LEMO, but more complicated to plug in/out) and LEMO on other end
  • HV connectors are Ficher (smaller than regular SHV)
  • Access to PMTs improved
  • boards slide like curtain to left/right - can almost access PMTs by hand from the back, but might need to optimize distance
  • Cooling
  • chilled plates around calorimeter crystals
  • cooled air in space between crystal and PCB - this space is crowded with many cables, poor air flow - difficult to cool
  • Temperature gradient crystals
  • will have probes in the box to measure temperature
  • discussing fan performance with vendor
  • isolation from room - boundary condition air
  • Time frame - start construction in second half of the year and finish early next year.
  • Funds availability - will confirm on 1 Feb


CRYSTALS (Vladimir)

  • Completed visual inspection of ~90% of first batch of CRYTUR crystals
  • NO rejections
  • Planning to measure tolerances for frame in next weeks
Crystal lengths are same for SICCAS and CRYTUR, but area slightly different
  • Action Item: make matrix where Crytur and SICCAS crystals would go - send numbers to Hamlet
  • Prototype: commissioning complete, will present preliminary results at collaboration meeting


NEXT MEETING: COLLABORATION MEETING 1 FEBRUARY