NPS SUBSYSTEM UPDATES

  • PMTs and HV Dividers
  • New PMTs were delivered with slightly different sockets - requires machining (or, if doesn't work get back to Hamamatsu)
  • 100 of the new PMTs were given to Hall D for assembly and tests
  • 1-2 new PMTs ready to be shipped to IPN-Orsay for assembly and tests
  • Assembly drawings of PMT+crystal module from HyCal are being collected - action item: get the original drawings from designers
  • similar to HMS calorimeter, but dimensions different and PbWO4 more fragile
  • found that in actual HyCal PMTs were NOT glued to crystal (that was only done for prototype modules)
  • OU got a quote for HV divider components - checking the details, if all looks ok, will go ahead with the full procurement


  • PbWO4 Crystals
  • Discussion of visual inspection and dimension measurements with caliper of box#3 (10 crystals) of the first set of 160 SICCAS crystals
  • Visual inspection shows that about half of these crystals have bubbles and/or chipped edges - according to data the company sent, this does not affect optical properties
  • Action item: post the data the company sent
  • Discussion about alternative measurement methods to make nondestructive measurement of crystal dimensions that is safer (and potentially faster) than measuring with caliper


[...]