Difference between revisions of "General Meeting Summary 12/1/16"
Jump to navigation
Jump to search
(Created page with "MAGNET UPDATE * Coils ::* big coil design drawings done, specs written, checked by engineering dept ::* quotation requests out to two companies ::* corrector coil design expe...") |
(No difference)
|
Latest revision as of 18:22, 1 December 2016
MAGNET UPDATE
- Coils
- big coil design drawings done, specs written, checked by engineering dept
- quotation requests out to two companies
- corrector coil design expected to be done soon - many local vendors available
- Steel/yoke
- design drawings done, specs written, checked by engineering
- quotation requests out to four companies
HIGH-INTENSITY WORKSHOP AGENDA
- Discussion about preliminary version
- missing seems a talk or discussion on effect of radiation on experiment/hall
- discussion about adding a talk about past experience with high-intensity sources
[... more to come]