Difference between revisions of "General Meeting Summary 12/1/16"

From Cuawiki
Jump to navigation Jump to search
(Created page with "MAGNET UPDATE * Coils ::* big coil design drawings done, specs written, checked by engineering dept ::* quotation requests out to two companies ::* corrector coil design expe...")
 
(No difference)

Latest revision as of 18:22, 1 December 2016

MAGNET UPDATE

  • Coils
  • big coil design drawings done, specs written, checked by engineering dept
  • quotation requests out to two companies
  • corrector coil design expected to be done soon - many local vendors available
  • Steel/yoke
  • design drawings done, specs written, checked by engineering
  • quotation requests out to four companies


HIGH-INTENSITY WORKSHOP AGENDA

  • Discussion about preliminary version
  • missing seems a talk or discussion on effect of radiation on experiment/hall
  • discussion about adding a talk about past experience with high-intensity sources

[... more to come]