https://wiki.jlab.org/cuawiki/index.php?title=General_Meeting_Summary_12/4/14&feed=atom&action=historyGeneral Meeting Summary 12/4/14 - Revision history2024-03-28T22:07:20ZRevision history for this page on the wikiMediaWiki 1.35.7https://wiki.jlab.org/cuawiki/index.php?title=General_Meeting_Summary_12/4/14&diff=533&oldid=prevHornt: Created page with "NPS WHITE PAPER AND SCIENCE SLIDES * The NPS White Paper has been submitted. It can be found here on the QCD Town Meetings web page * NPS Science slides are missing one slid..."2014-12-08T20:18:32Z<p>Created page with "NPS WHITE PAPER AND SCIENCE SLIDES * The NPS White Paper has been submitted. It can be found here on the QCD Town Meetings web page * NPS Science slides are missing one slid..."</p>
<p><b>New page</b></p><div>NPS WHITE PAPER AND SCIENCE SLIDES<br />
<br />
* The NPS White Paper has been submitted. It can be found here on the QCD Town Meetings web page<br />
<br />
* NPS Science slides are missing one slide - Donal, Jixie, and Dustin are working on it<br />
<br />
<br />
SWEEPING MAGNET<br />
<br />
* Bogdan shows an update on using the components of the same magnet for all NPS experiments<br />
::* In this design lose < 1 msr out of 25 msr solid angle<br />
::* requires minimizing deflection. The preferred way to do this would be with passive shielding. Need to evaluate carefully where one create such passive shielding in front of the magnet.<br />
<br />
* Magnet as local dump: this still requires a detailed radiation calculation.<br />
<br />
<br />
NPS SCIENCE<br />
<br />
* TCS with transverse target: Arthur is looking into the practical aspects of such a measurements, e.g., acceptance, luminosity. <br />
<br />
* Discussion of suggesting 2-3 talks on NPS Science (TCS, polarized RCS) and 1 talk on NPS at the January Hall C meeting. <br />
<br />
<br />
NPS FUNDING<br />
<br />
* Discussion about the NSF MRI and possible cost sharing contribution from Glasgow and level of involvement of UVa<br />
<br />
* A separate meeting is planned for Tue. 12/9 to discuss the details of the MRI <br />
<br />
<br />
CRYSTAL IRRADIATION STUDIES AT IDAHO<br />
<br />
* Discussion about main preparations<br />
<br />
::* Need to ship a mix of crystals from SICCAS produced in 2014 and earlier. Carrier: FedEx?<br />
::* Need to prepare a concrete plan for what tests will be done and who will go. Carlos and Hamlet will work on a draft and present it at the next NPS meeting in January.<br />
::* Need to calibrate the transmittance measuring device against the setup at, e.g., JLab - this could be done in January<br />
<br />
<br />
NEXT MEETING: THUR, 8 JANUARY at 9AM (EST)</div>Hornt