General Meeting Summary 2/20/20

From Cuawiki
Revision as of 18:10, 20 February 2020 by Hornt (talk | contribs) (Created page with "DISCUSSION 2020 NPS TO-DO LIST MECHANICAL DESIGN * Send updates on kinematics (DVCS) to the Hall C design team ::* mainly need NPS angle, distances, and HMS angle to check f...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

DISCUSSION 2020 NPS TO-DO LIST

MECHANICAL DESIGN

  • Send updates on kinematics (DVCS) to the Hall C design team
  • mainly need NPS angle, distances, and HMS angle to check for interference
  • consolidate everything into one table
  • Add a bullet with beamline specific items (this task would start after May 2020)
  • vacuum
  • corrector
  • need to have design and mounting concept
  • Crane operation smooth enough for NPS?
  • the abrupt stop/start has been a problem for aerogel tray (de)installations and optimizations have been ongoing

MAGNET

  • For bullet 2: generate documentation - helpful to see what has been done already and also needed for experiment and safety documentation
  • For fringe field vs. current main interest is the effect on the beamline
  • impact on physics was discussed at the 2/3 collaboration meeting

FRAME

  • Tasks, e.g. quotes, ongoing
  • Possible concept for insulation from mu metal (avoid electrical contact with PMT and crystal): instead of insulating material, e.g. kapton or teflon wrapping all tubes (labor intensive and labor is limited), retract the mu metal cylinder from the PMT front face
  • can show concept in more detail at next meeting
  • Preshaping
  • Wrapping material will be shipped to JLab
  • A relatively large oven (with max temp ~300degC) is available from Bogdan - how long is it needed?
  • Action item: prepare drawings of the needed additional shaping tools for parallel production of pre-shaped wrappers
  • Action item: prepare documentation for using the oven

CRYSTALS/GLASS

  • Working on paperwork to ship 10 CRYTUR crystals (and also connectors) to Orsay; planning to ship glass in May
  • For bullet 3: plan to check with Crytur in May/June on expedited delivery schedule
  • Follow up on location of the most recently shipped 10 Crytur crystals - have they arrived at JLab?

HV DIVIDERS

  • Calculations from 2/3 collaboration meeting showed a very high anode current (kinematics dependent)for NPS experiments
  • Hall D has made measurements of the anode current, but the configuration is different from NPS
  • A measurement of the anode current in NPS conditions in Hall C is not feasible
  • To verify the NPS calculations, can do:
  • compare calculation for Hall D configuration with Hall D measured anode current results
  • make a measurement of the anode current with LEDs prepared for expected NPS condition - has this been done already by Fernando?

DAQ AND ELECTRONICS

  • Tasks are ongoing
  • Bullet 8 - confirm with DSG the development of slow control SW has been completed

SIMULATION AND SOFTWARE DEVELOPMENT

  • Tasks are ongoing

NPS SCIENCE: TCS

  • Postponed to CPS meeting. However, slides are posted and comments welcome


NEXT MEETING: THURSDAY 26 MARCH AT 9:00AM (ET)