General Meeting Summary 3/19/15

From Cuawiki
Revision as of 19:06, 22 March 2015 by Hornt (talk | contribs) (Created page with "PLANS FOR PWO CRYSTAL TESTS * Consistency check of Idaho results with Rainer's setup in Giessen ::* Rainer can do irradiation tests as soon as we send him the crystals ::* D...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

PLANS FOR PWO CRYSTAL TESTS

  • Consistency check of Idaho results with Rainer's setup in Giessen
  • Rainer can do irradiation tests as soon as we send him the crystals
  • Discussion about how many crystals to send to Giessen.
  • Crystals expected to be released from Idaho in next few days. All crystals will be shipped back to JLab (contact is Walter) and from there crystals # 2, 3, 6, 8, and 9 will be shipped on to Rainer directly. Action items: 1) find out when crystals can be shipped from Idaho and process documentation needed (Carlos, Hamlet, ...) , 2) initiate shipment to Giessen (Rolf, Carlos, Hamlet, ...)
  • Received crystal samples, reflector, shrinking tube, APD readout components from Rainer
  • Discussion of how these materials could be used for the upcoming prototype tests
  • Further tests with remaining PWO crystals at JLab
  • Transmittance tests of the 5 crystals received in December 2014 - thus far have not been measured
  • Prototype tests with beam in Hall A until summer
  • Crystal recovery: depends on temperature (see slide 18 in Rainer's talk from Nov 2014 NPS collaboration meeting). For further studies of radiation hardness may need to consider a temperature stabilized system.
  • Crystal light yield: Light yield depends on temperature, e.g., Rainer's measurements were conducted in a temperature stabilized system at 18 degrees (see his talk from Nov 2014 NPS collaboration meeting). A temperature stabilized system could be beneficial for these tests.
  • Readout with APDs compared to phototubes

NPS PHYSICS

  • Discussion of planned submissions of LOI or proposals to PAC43
  • TCS with transverse target - will be discussed in more details in next meeting (Arthur)


ITEMS FOR NEXT MEETING:

  • TCS LOI for PAC43
  • Crystal studies at JLab and Giessen
  • Other...


NEXT MEETING: THUR., 9 APRIL 9:00 AM (EST)