Difference between revisions of "General Meeting Summary 3/21/19"

From Cuawiki
Jump to navigation Jump to search
(Created page with "MAGNET (Charles, Bogdan, Paulo, Rolf) * Mapper was delivered to JLab - some alignment modifications are being made * OSP for magnet mapping in test lab almost ready * Anoth...")
 
 
Line 42: Line 42:
 
::* ~54% pass  
 
::* ~54% pass  
 
::* Significant fraction of crystals have nonuniform sizes along crystal and smaller than specs
 
::* Significant fraction of crystals have nonuniform sizes along crystal and smaller than specs
 +
::* [[File:Visual inspections result.pdf]]
  
 
* Crytur update
 
* Crytur update

Latest revision as of 20:07, 25 March 2019

MAGNET (Charles, Bogdan, Paulo, Rolf)

  • Mapper was delivered to JLab - some alignment modifications are being made
  • OSP for magnet mapping in test lab almost ready
  • Another OSP is needed for the magnet operation in Hall C
  • Fringe field considerations on HMS axis - affects optics
  • <200G, calculation good enough
  • for close approach NPS and HMS configuration without shelf may be better


HV Divider (Fernando, Vladimir, Alex S.)

  • Actual amplifier gain may be ~28 (instead of ~10 as thought based on description)
  • Modified amplifiers being prepared
  • 3x3 prototype for beam tests in Hall D with HV divider with modified amplifier ready
  • allows for energy comparison
  • goal is to compare different amplifier gains, but also different crystals - start with Crytur


FRAME (Carlos)

  • Frame mock-up constructed and being used to determine optimal cable lengths
  • PCB assembly ongoing
  • Discussion about cable assembly - France or JLab


SIMULATION (Ho San)

  • Simulation in good shape - energy resolution, longitudinal and lateral energy deposition


CRYSTALS (Vladimir, Tanja)

  • Discussion about inspection of 160 SICCAS replacement crystals
  • Crytur update
  • next part of CUA order is on the way (currently have 18/55)
  • additional orders placed for 45 by OU and 100(+50) by JLab
  • expected capacity for future orders: 120 in calendar year 2019, 180-240/year for the next two years


NEXT MEETING: THURSDAY 4 APRIL AT 9AM (ET)