General Meeting Summary 3/22/18

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

ENERGY RESOLUTION SIMULATION UPDATE

  • Simulation details: calorimeter at 3m from a pointlike target source of electrons, which are spread out over the calorimeter surface
  • Based on previous studies:
  • A 1mm air gap increases the energy resolution by 1-1.5% - seems acceptable for physics
  • New: instead of air use carbon and look at energy resolution as function of function of distance between crystals
  • Energy resolution decreases more with the material than with air gap, impact is mainly on the constant term
  • Distance between crystals not as important as presence of material
  • A 1mm gap of carbon between crystals is mechanically feasible
  • Discussion about fitting PMT and its mu metal shielding in a slot determined by crystal transverse dimensions (20.5 mm) and carbon structure (1mm)
  • Current mu metal thickness is 0.3 mm - could be reduced to 0.1 mm, perhaps with additional box outside
  • PMT diameter tolerance is 0.5mm based on information from company (18.6mm) vs. a few measurements (19.1mm). ACTION ITEM: Measure ~20 PMTs to get an idea of the diameter variation/distribution


TCS BACKGROUND STUDIES

  • Goal is to determine the impact of bremsstrahlung background to TCS detector operation
  • Action Item: model photon spectrum and relate to electron intensity, obtain real photon flux


NPS PROTOTYPE

  • NPS 3x3 prototype is installed in Hall D and cosmic data have been taken - straight tracks going through one column in the center
  • Machinery for analysis has been setup and has been tested (single PE analysis etc.)
  • When beam available measure one point
  • Energy range might be extended by removing material, e.g. TRD, to access larger range of pair spectrometer (3-6 GeV)
  • Updates on mechanical engineering for 10x10 "prototype" (COMCAL)
  • Mechanically feasible to install in this location in Hall D
  • Time line for 10x10 frame construction is end of July/beginning of August
  • For 10x10 "prototype" and given the short time frame go ahead with HyCal design, but keep in mind modifications, e.g. carbon structure, to make ComCal similar to NPS prototype
  • ACTION ITEM: ask engineer if can accommodate later a carbon grid with 1mm crystal-to-crystal separation; figure out how to deal with shallow electron angles in Hall D
  • Discussion about gluing PMT to crystal
  • For Primex 1500 crystals, PMTs rarely failed, but question is how HV divider performs


OTHER UPDATES

  • Magnet: all components (coils, yoke) now at JLab
  • Crystals
  • Specifications table including COMCAL and FCAL now available
  • Based on discussions with PANDA, Crytur should be able to accommodate both theirs and NPS crystal productions
  • Communications with SICCAS about last procurement ongoing