General Meeting Summary 3/28/13

From Cuawiki
Revision as of 13:44, 29 March 2013 by Hornt (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

BACKGROUND STUDIES/DETECTOR

  • Exclusive experiments require the small beam pipe assembly allowing HMS to reach angles >=10.5 degrees. Though there may be solutions for kinematics with >=13 degrees these could only be achieved at the cost of changing kinematics and reducing the range of lever arm in Q^2. Thus dropping these smaller angles would lead to an important loss of physics.
  • From WACS point of view a bigger beam pipe could be preferable depending on the relative contribution of backgrounds from target and beam pipe components.
  • Scattering Chamber information:
  • outer diameter = 45 inches
  • inner diameter = 43.125 inches
  • distance beam line to SHMS window = 1.25 inches
  • So for a point target, the minimum angle is 58 mr or 3.4 degrees. For an extended target you will need to adjust, it becomes about 4 degree for a 15 cm target. So assume 3.5 degrees as rough number.


DVCS/MESON KINEMATICS

  • Review and finalize kinematics table. Special meeting set up for Tuesday 2 April.


PROPOSAL PREPARATION

  • Proposal submission due date is Monday, 6 May, at 8 AM.
  • WACS is planning to circulate draft proposal for collaboration sign up around 20 April.
  • Some discussion on the core list of collaborators for each proposal (perhaps good start is [the list of collaborators] listed on Wiki?)
  • Decided on LaTeX as official :-) language for proposal writing


ITEMS FOR NEXT MEETING:

  • Evaluate the fraction of background from target vs. beam line components.
  • DVCS/meson final kinematics
  • Based on previous proposal(s) prepare list of requests for information on technical aspects of the detector, e.g., paragraphs, figures etc. needed for the proposal instrumentation section


NEXT MEETING: THUR, 4 APRIL at 9AM (EST)