General Meeting Summary 3/31/16

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

BACKGROUND STUDIES

  • Discussion about Vardan's GEANT4 simulation
  • shows a background reduction, in particular for electrons, that is different from that shown in Vardan's earlier studies and also David Hamilton's GEANT4 studies.
  • depending on the charged background reduction prediction may want to consider a charged particle absorber in front of the calorimeter (DVCS/HA used 10 cm of plastic - absorbs electrons up to 20 MeV)
  • Action item: check implementation and also compare to previous results


UPDATE ON HV DIVIDER STUDIES

  • Discussion of gain stability studies with C-W base design with PMT and APDs
  • APD-based readout could be interesting if magnetic fields are too strong to shield from
  • To compare to our current default active base design need to have gain stability as function of anode current for C-W bases - a double-LED setup may be advantageous to use for these tests
  • may want to correlated jitter in output signal to input driver
  • Follow-up to question about radiation damage to processor from Hall C January meeting
  • may not be an issue as it is possible to separate digital part from calorimeter by sufficient distance - requires ribbon cables, but still not as many as with default base design
  • Action item: determine linearity at high rate for C-W bases
  • check against default base parameters
  • include amplifier in base
  • must have test with amplifier done before September 2016


MAGNET UDPATE

  • Discussion about magnet budget for machining the steel (now at JLab) and coil
  • machining and procurement of conductor require design drawings - ongoing activity
  • Discussion about most recent design update from M. Fowler
  • interferences at small angles require a specialized beam pipe - cannot complete magnet design without this
  • Hall C beam line design is currently ongoing, so good time to take this into account


ITEMS FOR NEXT MEETING:

  • Follow-up background study (Vardan)
  • Magnet updates
  • Other Action Items from list, e.g., magnetic shielding of PMTs, support structure and frame
  • Other...


NEXT MEETING: THUR 21 APRIL, TIME: 9:00 AM (EDT)