Difference between revisions of "General Meeting Summary 4/13/17"
Jump to navigation
Jump to search
(Created page with "MAGNET AND PREPARATION PLAN * Discussion about general checks and assembly once coils and yoke arrive (anticipate July/August) ::* power supply to be used: HKS, can be moved...") |
(No difference)
|
Revision as of 18:01, 13 April 2017
MAGNET AND PREPARATION PLAN
- Discussion about general checks and assembly once coils and yoke arrive (anticipate July/August)
- power supply to be used: HKS, can be moved between halls
- magnet assembly could be done in test lab, testing magnet is more challenging due to power and cooling requirements
TO BE CONTINUED....