General Meeting Summary 4/16/20

From Cuawiki
Revision as of 14:53, 17 April 2020 by Hornt (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

PARTICIPANTS: V. Berdnikov, A. Camsonne, C. Munoz-Camacho, R. Ent, M. Fowler, T. Horn, C. Hyde, S. Lassiter, P. Medeiros, H. Mkrtchyan, J. Murphy, J. Roche, V. Tadevosyan, B. Wojtsekhowski


MAGNET AND DESIGN (Charles, Paulo, Steven, Mike)

  • Analysis of magnet fringe field data and comparison to calculation is ongoing
  • The Hall A/C engineering/design team is working on NPS cable layout
  • Two main routing options, one more direct but also makes cables longer - seems fine from NPS point of view, but need to check with Hall C
  • Also need to take into account CPS in overall cable layout

* Action items:

  • Send updated DVCS kinematics table with settings moved to Hall C from Hall A to Steven L.
  • Check with Brad S. on cable routing, patch panel, etc.
  • Include CPS in overall cable layout


FRAME (Carlos)

  • Construction started, but on hold until end of lockdown - currently expect re-opening after May 11
  • Crystals and LED connectors arrived in Orsay
  • Cabling of LED connectors is ongoing

* Action item: check on cable making effort at JLab


CRYSTALS (Vladimir, Tanja)

  • Had email communication with Crytur. Vendor is working on a proposal for crystal delivery for rest of FY20 and FY21 - expect update after 4/17
  • A few boxes of Crytur crystals that arrived last month await to be inspected. Furthermore, the expected SICCAS crystal arrived (60 of those to NPS) and await inspection
  • SICCAS crystals were preselected in Shanghai by a FCAL collaborator from Wuhan U. - 13% of all inspected crystals were rejected based on simple visual inspection

* Action items:

  • check on options for Crytur to send ~70-100 crystals to JLab on 30 August. These would arrive in multiple boxes with different invoices due to issues with the carrier on vendor's side.
  • check on options for both vendors to keep producing and sending crystals - options for storage at JLab


HV DIVIDERS (Vladimir, Tanja)

  • Ho San's estimates assuming PMT gain 10^6 and integration time 50ns show anode currents of 13mA (beam current: 11uA) and 80mA (beam current: 50uA) for the most extreme experiment kinematics/configurations
  • three orders of magnitude higher than the 100uA PMT limit
  • would require to reduce gain of PMT by 1000 and rest of amplification done by divider
  • for HV divider might need gain of 25 - regarding increased nonlinearity, note that unlike Primex NPS does not need absolute detection efficiency
  • Action items:
  • Check Ho-San's numbers from full-scale calculations with, e.g. CPS framework or direct calculations with photon component only
  • Evaluate how to do physics with possibly reduced PMT gain, e.g. model from G0 experiment


DVCS WITH POSITRONS PROPOSAL (Carlos)

  • Investigation of DVCS with positron compared to electron beam
  • Projections complete, discussions of systematics due to positron beam ongoing
  • Expect to circulate proposal in 3-4 weeks. PAC submission deadline is 1 June.


TCS - LOW MOMENTUM PROTONS AND TRACKING (Vardan)

  • Slides posted - presentation in 4/17 CPS meeting


NEXT MEETING: THURSDAY 7 MAY AT 9:00AM (ET)