General Meeting Summary 5/2/19
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
DISCUSSION OF DRAFT TALKS
TANJA
- Add experimental techniques for both sets of experiments
- Under General requirements: add electron beam energies (p.3) and statement that two separate configurations (SHMS right for angles below 23 deg and SHMS left) are needed (p.4)
STEVE W.
- Input on exact number of crystals (Tanja)
- Refer to Carlo's talk for discussion of frame and amplifiers including results from recent beam tests
- plan for frame delivery is summer 2020
- Time frame for detector placement and cabling - estimate is ~one month based on Hall A DVCS experience
- High level software - list INP-Orsay
- Radiator - same as for J/Psi, follow up with target group on details
STEVE L.
- Change "patch panel #1" to something like "cable support"
- Plan for transition from SHMS right to SHMS left configuration in backup
- Clarify spectrometer support group time, e.g. 100% available
- Ready to put slides into ERR specific template as needed
CHARLES
- Working on final slides - plan is to include further detail on: 1) plan for mapping and running and 2) safety and operation
CARLOS
- Working on final slides
- Input on exact number of crystals (Tanja)
BRAD S.
- Working on final slides
- Slow controls and LED subsystems - follow up with Carlos and Julie
- Communications with fast electronics group ongoing
JAY
- No changes to slides
GABRIEL
- Add specifics for neutral particles: photon, neutral pion