General Meeting Summary 5/2/19

From Cuawiki
Revision as of 14:28, 2 May 2019 by Hornt (talk | contribs) (Created page with "DISCUSSION OF DRAFT TALKS TANJA * Add experimental techniques for both sets of experiments * Under General requirements: add electron beam energies (p.3) and statement that t...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

DISCUSSION OF DRAFT TALKS

TANJA

  • Add experimental techniques for both sets of experiments
  • Under General requirements: add electron beam energies (p.3) and statement that two separate configurations (SHMS right for angles below 23 deg and SHMS left) are needed (p.4)


STEVE W.

  • Input on exact number of crystals (Tanja)
  • Refer to Carlo's talk for discussion of frame and amplifiers including results from recent beam tests
  • plan for frame delivery is summer 2020
  • Time frame for detector placement and cabling - estimate is ~one month based on Hall A DVCS experience
  • High level software - list INP-Orsay
  • Radiator - same as for J/Psi, follow up with target group on details


STEVE L.

  • Change "patch panel #1" to something like "cable support"
  • Plan for transition from SHMS right to SHMS left configuration in backup
  • Clarify spectrometer support group time, e.g. 100% available
  • Ready to put slides into ERR specific template as needed


CHARLES

  • Working on final slides - plan is to include further detail on: 1) plan for mapping and running and 2) safety and operation


CARLOS

  • Working on final slides
  • Input on exact number of crystals (Tanja)


BRAD S.

  • Working on final slides
  • Slow controls and LED subsystems - follow up with Carlos and Julie
  • Communications with fast electronics group ongoing


JAY

  • No changes to slides


GABRIEL