General Meeting Summary 5/28/20

From Cuawiki
Revision as of 09:48, 29 May 2020 by Hornt (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

PARTICIPANTS: Charles Hyde, Bogdan Wojtsekhowski, Arshak Asaturyan, Vardan Tadevosyan, A Comer, Hamlet Mkrtchyan, Alexandre Camsonne, Paulo Medeiros, Steven Lassiter, Vladimir Berdnikov, Carlos Munoz-Camacho, Jacob Murphy, Marie Boer, Hakob Voskanyan, Rolf Ent, David Hamilton, Julie Roche, Tanja Horn


MAGNET

Work ongoing

FRAME (Carlos)

  • Photos from pre-lock down illustrate the assembly status - some of the smaller components were assembled off-site during lock down and are ready to be included when possible
  • Small number of people allowed part time on site now and some assembly can continue, subject to new distancing rules etc.

NPS LOGO

  • Presentation of the logo planned to be included on the NPS frame
  • Optimizations and other suggestions welcome

CABLING

  • NPS cable making is ongoing at JLab (off-site)
  • SMA for signal
  • Fischer for HV
  • Samtec HV
  • How to test cables?

MECHANICAL DESIGN (Paulo, Steven L.)

  • Released requisitions for structural components (platform)
  • Expect all other parts to be submitted by end of week
  • Prepared and passed on step files for corrector magnet
  • Results from field integral calculations (Bogdan)
  • Significant integral BdL (~30-40kGauss) without corrector, need to compensate for field integral
  • Field integral not large - can build corrector without much problem (cost ~$10k)
  • Corrector cannot compensate for shift in position, still have significant displacement - shift is on level of 4cm creating a background: low energy particles will scrape beam line
  • To address this issue would like to shift corrector 15cm downstream - requires to modify a pipe (~$3k)
  • Discussion:
  • Corrector in beam line after magnet has been difficult traditionally - cables, power supplies space issues, radiation of components
  • Flux exclusion tube vs. corrector magnet? - Is there enough space? Tube seems more complex and complicated than corrector
  • Installation of corrector: clamped on beam line, no separate support
  • Current density: 200-300 A/cm2, no water cooling - the latter is important since located in a high radiation area
  • Corrector is a protection of beam dump - magnet controlled by MCC, deflection without magnet of primary beam is 6cm at beam dump
  • Can corrector magnet hang off the NPS magnet and rotate with the magnet?
  • General consensus to proceed with the corrector magnet design


HV DIVIDER - ANODE CURRENT

  • Review of the issue and discussion of possible solutions
  • Need to reduce PMT gain - 10^6 too much and even 10^5 too much, 10^4 might be fine, but then need to figure out how to do amplification
  • Bogdan's slides summarize several options to reduce anode current, but need feedback from Fernando's group on base modifications
  • Action Item: Meet with Fernando on base modifications


NEXT MEETING: THURSDAY 11 JUNE AT 9AM (ET)