General Meeting Summary 5/31/18

From Cuawiki
Revision as of 23:14, 13 June 2018 by Hornt (talk | contribs) (Created page with "DISCUSSION PAC46 * Positron LOI - agreement to join as NPS collaboration, some discussion about the format, e.g. Hall C only or all, listing of names * TCS proposal ::* Disc...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

DISCUSSION PAC46

  • Positron LOI - agreement to join as NPS collaboration, some discussion about the format, e.g. Hall C only or all, listing of names
  • TCS proposal
  • Discussion about acceptance, must be folded in, in particular make very clear that there is a region in t where one cannot detect much
  • Discussion about beam time request - should be divided into components: physics, configuration, checkout
  • Agreement to join proposal as NPS collaboration
  • Action item: update collaboration list and circulate


MAGNET ASSEMBLY

  • All pieces are in test lab and ready to be assembled


CRYSTAL UPDATES

  • Presentation of irradiation studies at IPN-Orsay and comparison of measurements with same crystals at Giessen U.
  • For this subset, 2/10 crystals fail NPS specifications (J11, J23) - these also failed when tested at Caltech and CUA
  • Overall very good agreement between Giesssen and Orsay results
  • Discussion about 450 crystal procurement
  • Manufacturing uncertainty at Crytur - even after discussion with Rainer no change in pricing
  • Production process uncertainty SICCCAS - company now agreed to replace crystals and discuss about quality control optimization
  • Decide to make decision on path forward in week of June 11

HV BASES

  • Received new bases and sent to Chris/Fernando for quality checks - looks good
  • Full order put in on May 17 - should receive in beginning of June
  • Sockets received at OU too - ready to start assembly and testing
  • Discussion about cable length from base to patch panel and cable type - have not really decided yet, depends on outcome of cabling studies at IPNO
  • 35 PMTs will be brought from OU to JLab in week June 18


NEXT MEETING: THURSDAY 14 JUNE AT 9:00 AM (EDT)