Difference between revisions of "General Meeting Summary 7/30/15"
Jump to navigation
Jump to search
(Created page with "SWEEPING MAGNET * Design: Dipole and 2 plates (field clamp and corrector coil) * Fringe fields should be manageable * Power supply: requirements much less than SBS (~2000 A) ...") |
(No difference)
|
Latest revision as of 16:46, 2 August 2015
SWEEPING MAGNET
- Design: Dipole and 2 plates (field clamp and corrector coil)
- Fringe fields should be manageable
- Power supply: requirements much less than SBS (~2000 A) power supply
- Additional steel required for WACS is part of UK funding proposal. This additional steel can be attached to the side of the magnet
- Next steps
- 3D geometry check with HC infrastructure, e.g., vertical clearance, fit on pivot etc. (Charles, designers, ...)
- Re-do radiation calculations (Hamlet, Rolf, Pavel, TH)
READOUT
- Working on trigger, summed fADC trigger, single crate configuration to simplify the setup
NPS TEMPERATURE
- Nominal temperature: 18 degrees with good stabilization (+- 0.5 degrees)
- Flexible design if need to cool down later
NPS COLLABORATION MEETING
- Best seems to be adjacent to HC/HA meetings in January 2016
ITEMS FOR NEXT MEETING:
- Other...
NEXT MEETING: THUR 20 AUGUST, TIME: 9:30 AM (EDT)