Meeting-05052022

From Cuawiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Agenda

  • DAQ and firmware
  • Slow controls
  • Decoding software (FADC mode10, VTP data, unblocking)
  • Online software (raw displays, gui, interface with ET system)
  • Offline reconstruction (clustering algorithm, multi-threading)
  • Other business

DAQ and slow control update (Brad)

  • Move to EEL 108 delayed but all hardware needed (cdaql3, monitor, etc) is in hand.
  • Slow controls are in good shape (Brad met with Aaron) including HV, chiller and thermal readback.
  • Still a bit of work needed on the LED board GUI but we can control from the terminal during initial tests.

Online software update (Julie)

  • Julie and Pramita working on analysing SHMS PionLT mode10 data.
  • There was a question about the timeline for "first interesting data". Brad suggested it would probably be mid-June at the earliest.