Meeting-06232022
Jump to navigation
Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.
General Information
- Logbook
- Slack
- NPS on CUE system
- Brad's Hall A/C computing tricks and tips
- /work/hallc/nps for development code, etc (NB not backed up)
- /volatile/hallc/nps for large data file (write to tape if anything you want to keep: /mss/hallc/c-nps/analysis)
- /mss/hallc/c-nps/raw is where raw data will go.
- hcana and replay set up instructions (for pionLT run)
Zoom link
https://jlab-org.zoomgov.com/j/16162588644?pwd=eklwZko1TDZkam1Ba3dSYVkyVlk4dz09
Agenda
- DAQ and firmware
- Slow controls
- Software (see below)
- Other business
DAQ update (from Brad)
- Assembly ongoing in EEL108
- Move cdaql3 from counting house to EEL
- Brad and Bryan have been looking at setting up CODA3 filesystem layout
- Also been talking with Ben about status of required firmware
Software task list (draft)
- Near-term priorities (for summer tests)
- hcana FADC mode 10 code (Mark, David) -- DONE
- collect everything together on GitHub (David)
- hcana NPS class, replay script and database file (David)
- online display and cosmic calibration scripts (Julie, Pramita, Alexandre, Zheng)
- code to handle VTP data in hcana (David)
- Medium-term (summer - fall)
- data unblocking (David, Brad, Bryan)
- geant4 simulation (Marie, Deb)
- online interface with ET system (Paul)
- Longer term
- offline reconstruction and clustering (Steve, Carlos Y, Julie, Pramita)
- offline calibration scripts (??)
Software discussion
- Pramita gave an update of the progress they have made with looking at the SHMS pionLT FADC mode10 data.
- Paul volunteered to look at integration with ET system.
- PolHe3 software developed by Sylvester and Whit (some details here and here -- NB required different (non-standard) evio library).
- Ben going to provide VTP update at next main NPS meeting (30th June)?
- It will be important to collect everything we have together on JLab github:
- Mark provided an update on hcana FADC tree variables.
- Mark is going to integrate the firmware_update changes into the main hcana develop branch.
- Marie, Deb and David to meet next week to discuss geant4 simulation efforts.
- We'll set up a meeting with Bryan M in early July to discuss data unblocking:
- examples from Compton DAQ and proof-of-principle.
Next meeting
Thursday 14th July at 9am EST