Meeting 14 January 2022

From Cuawiki
Revision as of 12:20, 15 January 2022 by Hornt (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

DISCUSSION ITEMS

  • Design models, stress/thermal calculations
  • TCS updates

Brannon Semp (VT): TCS double spin asymmetries TCS updates on BTSA

  • Other
  • J/psi transverse asymmetries near threshold

Marie Boër, Erik Wrightson: physics goals and Erik's work update


PARTICPANTS: Steven L., Bogdan, Rolf, Amy, Brannon, Hamlet, Hovanes, Marie, Tanja, David H.


MECHANICAL DESIGN/ENGINEERING

  • Coil discussions with potential vendor - preparing material for review
  • pancake option vs. continous wound option (less splices/joints) - both are within regime of existing power supplies - need to revisit if/which existing power supply to use
  • cooling system options - closed/contained circuit vs. open - need to check with Radcon on requirements for 1-10kW dumps around beamline
  • Action items:
  • radiation of LCW
  • voltage of power supply
  • extend flanges outside shielding
  • Design work started on CPS/shielding platform
  • 44 80W20Cu (alloy WCu) blocks moved to Physics storage and one crate opened for inspection


UPDATES TCS

  • Discussion

NEXT MEETING: FRIDAY 11 FEBRUARY AT 8AM ET