DISCUSSION ITEMS
- Design models, stress/thermal calculations
- Engineering analysis and planning Status Update
- TCS updates
Brannon Semp (VT): TCS double spin asymmetries TCS updates on BTSA
- Other
- J/psi transverse asymmetries near threshold
Marie Boër, Erik Wrightson: physics goals and Erik's work update
PARTICPANTS: Steven L., Bogdan, Rolf, Amy, Brannon, Hamlet, Hovanes, Marie, Tanja, David H.
MECHANICAL DESIGN/ENGINEERING
- Coil discussions with potential vendor - preparing material for review
- pancake option vs. continous wound option (less splices/joints) - both are within regime of existing power supplies - need to revisit if/which existing power supply to use
- cooling system options - closed/contained circuit vs. open - need to check with Radcon on requirements for 1-10kW dumps around beamline
- Action items:
- radiation of LCW
- voltage of power supply
- extend flanges outside shielding
- Design work started on CPS/shielding platform
- 44 80W20Cu (alloy WCu) blocks moved to Physics storage and one crate opened for inspection
UPDATES TCS